Ć
%&( $# #)" &&#$
6 - 59
Siemens AG
⋅
May 1998
All secondary test sets must be removed. Measuring
inputs must be connected. The installation instrucĆ
tions according to chapter 5.2 must have been comĆ
pleted. For the primary tests, the switchgear must be
connected and switched on.
Warning
Primary tests may only be conducted
by qualified personnel who are fully
conversant with the commissioning of
protection systems, the operation of
the network and with the safety regulaĆ
tions and precautions (switching, earthĆ
ing, etc.).
6.6.1
Checking the current transformer polarĆ
ity with the load current.
1st step:
Read out isolator mimic by direct addressing
DA
7300/ZE
. The indications represent the station status
(which isolator is connected to which busbar).
2nd step:
Take all feeders out of service with
DA 64XX/ZE; DA 4500/FE
or via the binary inputs of
the bay units. Read out commissioning measured vaĆ
lues for ZPS-BSZ1 to 3 (
DA 7400/ZE
for ZPS-BSZ1,
DA 7500/ZE
for ZPS-BSZ2 and
DA 7600/ZE
for
ZPS-BSZ3). If the protection is functioning properly,
the diff-current for ZPS-BSZ2 andZPS-BSZ3 should
be nearly zero and under ZPS-BSZ1 the actual diff-
current with the set CT polarity should be displayed,
since taking the feeders out of service should have no
effect on ZPS-BSZ1.
On the bay units the differential and stabilizing curĆ
rents of the check zone are also displayed. This alĆ
lows immediate local check of modified CT polarities
via
DA 1101/FE
.
For further commissioning work, the diff-current in
ZPS-BSZ1 is only read after all CTs have been set to
the correct polarity.
3rd step:
One feeder at a time is released in turn and the differĆ
ential and stabilizing currents are read out via
DA 7500/ZE, DA 7600/ZE
. The results must be equal
to feeder current x normalizing factor (CT ratio
DA XX06/ZE
). Otherwise, the CT ratio must be
checked for correctness.
This step is repeated individually for each feeder.
At the conclusion of this, all feeders are taken "out of
service".
4th step:
The feeder with the largest current connected to busĆ
bar Xis put into service and the diff-current on ZPS-
BSZ2 and 3 is recorded.
5th step:
Next, the feeder connected to busbar Xwith the secĆ
ond largest current is put into service. If the load diĆ
rection is the same as for the feeder in step 4, then
the diff-current should be greater provided the polarĆ
ity of the CT is correct. Otherwise, the polarity of the
CT must be reversed by changing the setting in the
correct DA (e.g.
DA YY05/ZE
for feeder YY) (see
capter 6.2.3.3).
For opposite load direction, suitable measures must
be adopted. The stabilizing current is the average valĆ
ue of the sum of the magnitudes of the connected
currents. For sinusoidal currents, the r.m.s. values are
calculated by applying the factor 1.11.
6th step:
Step 5.) is repeated until all feeders of BZ Xhave
been taken into service.
7th step:
Steps 4.), 5.) und 6.) are repeated for all other busĆ
bars. At the end of these measurements, the diff-curĆ
rent should amount to almost zero.
8th step:
Diff-current and stabilizing current of ZPS-BSZ1 are
read out via
DA 7400/ZE
. The diff-current must be
almost zero and the stabilizing current must correĆ
spond to the average value of the sum of the magniĆ
tudes.
www
. ElectricalPartManuals
. com
Содержание SIPROTEC 7SS52
Страница 1: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 2: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 3: ... Siemens AG 1998 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 6: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 17: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 33: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 34: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 35: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 36: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 44: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 166: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 168: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 170: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 184: ... 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 186: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 202: ... 0 0 0 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 206: ... X w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 208: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 209: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 210: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...