![Siemens SINAMICS PERFECT HARMONY GH150 6SL3826 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/siemens/sinamics-perfect-harmony-gh150-6sl3826/sinamics-perfect-harmony-gh150-6sl3826_operating-instructions-manual_378209019.webp)
● Only qualified personnel or personnel supervised by responsible, skilled specialists are
allowed to carry out basic planning and all work on the device.
● During shipping, specific transport conditions are adhered to.
● Assembly is performed according to assembly instructions. Separate cabinet units are
connected properly (cables and busbars).
● All instructions for EMC-compatible installation, cabling, shielding, grounding, and for
adequate auxiliary power supply are to be observed.
● Commissioning is only to be performed by qualified personnel trained for that purpose in
accordance with the commissioning instructions.
● System configuration is carried out by an experienced system integrator. Additional system
components - such as circuit-breaker, transformer, cables and motor - are coordinated and
harmonized with one another for drive operation.
● The device is only operated in conjunction with the engineered components.
● Different operating modes, overloads, load cycles, and differing environmental conditions
are permitted only after special arrangement with the manufacturer.
Make use of the support and services offered by the relevant service center for planning,
installation, commissioning, and servicing work. You can find the relevant contact person under
"Service & Support (Page 123)".
2.7.2
Grounding concept
Draw-up a grounding concept and integrate the device into this concept. The grounding
concept must take into consideration national provisions and system specifics. Ensure that the
following criteria are fulfilled:
● At the installation site, the various subunits must be screwed together to establish a good
electrical connection between them.
● If shield busbars are provided, these must be connected together.
● The protective grounding conductor must be connected to the system the grounding point.
Select the highest cross-section of the protective grounding conductor from one of the
following variants:
– According to local wiring regulations
– Calculated according to IEC 60364-5-54, 543.1
– Half a phase conductor cross-section
Safety instructions
2.7 Information for persons responsible for plants and systems
SINAMICS PERFECT HARMONY GH150 6SL3826
Operating Instructions 05/2020
19
Содержание SINAMICS PERFECT HARMONY GH150 6SL3826
Страница 2: ...19 06 2020 09 25 V14 00 ...
Страница 120: ...Spare parts SINAMICS PERFECT HARMONY GH150 6SL3826 120 Operating Instructions 05 2020 ...
Страница 124: ...Service Support SINAMICS PERFECT HARMONY GH150 6SL3826 124 Operating Instructions 05 2020 ...
Страница 130: ...Quality documents SINAMICS PERFECT HARMONY GH150 6SL3826 130 Operating Instructions 05 2020 ...
Страница 132: ...Additional documents SINAMICS PERFECT HARMONY GH150 6SL3826 132 Operating Instructions 05 2020 ...
Страница 135: ......
Страница 136: ...Further Information www siemens com LDA Siemens AG Large Drives Applications Vogelweiherstr 1 15 90441 NÜRNBERG GERMANY ...