4.2.2
Requirements placed on the levelness of the floor
Ensure that the following requirements are satisfied:
● The floor is completely horizontal and flat.
● The doors can be opened and closed. The locking systems function correctly.
● Flat parts and components, e.g. doors and side panels, seal correctly. Only then is the
degree of protection maintained.
4.3
Inspections when receiving the delivery
4.3.1
Checking shock and tilt indicators
The purpose of shock and tilt indicators
The unit is equipped with shock and tilt indicators to monitor for damage during transit. It is
essential that you check the shock and tilt indicators before commissioning the unit.
WARNING
Tripped shock and tilt indicators
Safe operation of the device is not guaranteed if the shock or tilt indicator has tripped
(responded)
This can result in death, serious injury or material damage.
● If one of the indicators has tripped, do not perform any commissioning.
● Inform the Technical Support. Only specialist Siemens technicians can recommend
appropriate measures.
See also
Preparations for use
4.3 Inspections when receiving the delivery
SINAMICS GL150 6SL38555UN113KA0Z
Operating Instructions Rev.201910281450 EXAMPLE
69
Содержание SINAMICS GL150
Страница 2: ...28 10 2019 14 50 V18 00 ...
Страница 60: ...Description 3 5 Options SINAMICS GL150 6SL38555UN113KA0Z 60 Operating Instructions Rev 201910281450 EXAMPLE ...
Страница 106: ...Commissioning SINAMICS GL150 6SL38555UN113KA0Z 106 Operating Instructions Rev 201910281450 EXAMPLE ...
Страница 150: ...Spare parts SINAMICS GL150 6SL38555UN113KA0Z 150 Operating Instructions Rev 201910281450 EXAMPLE ...
Страница 162: ...Index SINAMICS GL150 6SL38555UN113KA0Z 162 Operating Instructions Rev 201910281450 EXAMPLE ...
Страница 163: ......
Страница 166: ......
Страница 168: ......