Commissioning
4.1 Commissioning with STARTER
CU250S-2 Control Units
Compact Operating Instructions, 05/2014, A5E32899990B AB
17
Setting the USB interface
Procedure
Proceed as follows to set the USB interface in STARTER:
1.
In this case set the "Access point" to "DEVICE (STARTER, Scout)" and the "PG/PC
interface" to "S7USB".
2.
Press the "Update" button.
You have set the USB interface.
STARTER now shows the inverters connected via USB.
Starting the configuration
Procedure
To start the configuration, proceed as follows:
1.
In STARTER select the drive you wish to commission.
2.
Start the wizard for the device configuration:
You have started the configuration.