CU250S-2 Control Units
Compact Operating Instructions, 05/2014, A5E32899990B AB
15
Commissioning
4
Requirements for commissioning
Use one of the PC tools STARTER or Startdrive to commission
the inverter.
You can access the inverter with STARTER or Startdrive either
via a USB connection or via the fieldbus.
System requirements and download:
•
STARTER
http://support.automation.siemens.com/WW/view/en/26233
•
Startdrive
http://support.automation.siemens.com/WW/view/en/88851
Help for the operation and for the functions of the commissioning tools:
●
STARTER videos (
http://www.automation.siemens.com/mcms/mc-drives/en/low-voltage-
inverter/sinamics-g120/videos/Pages/videos.aspx
●
Startdrive tutorial (
http://support.automation.siemens.com/WW/view/en/73598459
Commissioning with STARTER is described in the following.
4.1
Commissioning with STARTER
Creating a STARTER project
Procedure
In order to create a new project, proceed as follows:
1.
In the STARTER menu, select "Project" → "New…".
2.
Specify a name of your choice for the project.
You have created a new STARTER project.