Electrical connection
8.3 System integration
1FW68 radial segment motors
168
Configuration Manual, 08/2021, A5E51132930B AA
8.3.11.1
Checking EMFs
Note
Commissioning
Your local Siemens office can support you when commissioning your drive system.
Contact data is provided in the introduction under "Technical Support".
Requirements placed on the EMFs
The EMFs of all stator segments must satisfy the subsequent requirements.
Phase sequence
When rotating in the positive direction, the phase sequence of all stator segments must
be as follows:
EMF phase U
–
EMF phase V
–
EMF phase W.
The phase shift of the individual voltages EMF phase U
–
EMF phase V
–
EMF phase W
with respect to one another is 120
°
as shown in the following diagram.
Phase position
Figure 8-8 Phase sequence EMF phase U
–
EMF phase V
–
EMF phase W
Содержание SIMOTICS T-1FW68
Страница 1: ......
Страница 2: ......
Страница 14: ...Table of contents 1FW68 radial segment motors 12 Configuration Manual 08 2021 A5E51132930B AA ...
Страница 128: ...Configuring 5 2 Mounting 1FW68 radial segment motors 126 Configuration Manual 08 2021 A5E51132930B AA ...
Страница 193: ......
Страница 194: ......