8.3.2
Avoidance of frost and corrosion damage in the cooling system
● For avoidance of frost and corrosion damage, completely drain the water from the cooling
system. Then blow air through the cooling system to dry it.
If the cooling system cannot be drained because standby capability is required at short
notice, protect the cooling circuit against frost and corrosion damage. To do this, add
suitable additives to the cooling water.
NOTICE
Impairment of the heat transport
Additives such as anti-freeze and corrosive inhibitor can impair the heat transport.
Operate the motor only with the contractually agreed water quality.
For avoidance of deposits, the cooling water circuit must then be kept running. So as to be
certain of excluding the possibility of formation of condensation within the machine, the anti-
condensation heating should also remain switched on (if fitted).
8.3.3
Avoidance of condensation or formation of condensation within the machine
● If the controller does not do this automatically, switch on any anti-condensation heating
during stoppages. This will avoid the formation of condensation.
● Do not switch on the anti-condensation heating for at least two hours after the motor has
been switched off. This prevents damage to the winding insulation.
8.3.4
Avoidance of damage to roller bearings during stoppages
Extended stoppages at the identical or almost identical resting position of the roller bearings
can lead to damage such as brinelling or corrosion, for example.
● During stoppages, regularly start the machine up for a brief period once a month. As a
minimum, rotate the rotor several times.
If you have uncoupled the machine from the driven machine and secured the rotor with a
rotor shipping brace, then remove this before turning the rotor over or starting the machine
up.
Make sure that the resting position of the roller bearings after the rotor has been turned
over is different from what it previously had been. Use the fitted key or the coupling halves
as reference markers.
● During re-commissioning, refer to the information in the "Commissioning" section.
See also
Operation
8.3 Stoppages
SIMOTICS HT Series HT-direct 1FW4...1......A
Operating Instructions 11/2018
91
Содержание SIMOTICS HT Series
Страница 2: ...13 11 2018 16 25 V5 00 ...
Страница 10: ...Table of contents SIMOTICS HT Series HT direct 1FW4 1 A 10 Operating Instructions 11 2018 ...
Страница 26: ...Description SIMOTICS HT Series HT direct 1FW4 1 A 26 Operating Instructions 11 2018 ...
Страница 62: ...Assembly 5 6 Insulated bearings SIMOTICS HT Series HT direct 1FW4 1 A 62 Operating Instructions 11 2018 ...
Страница 108: ...Maintenance 9 2 Corrective Maintenance SIMOTICS HT Series HT direct 1FW4 1 A 108 Operating Instructions 11 2018 ...
Страница 116: ...Disposal 11 7 Disposal of components SIMOTICS HT Series HT direct 1FW4 1 A 116 Operating Instructions 11 2018 ...
Страница 118: ...Service and Support SIMOTICS HT Series HT direct 1FW4 1 A 118 Operating Instructions 11 2018 ...
Страница 122: ...Quality documents SIMOTICS HT Series HT direct 1FW4 1 A 122 Operating Instructions 11 2018 ...
Страница 127: ......