Mounting the terminal box
1. Screw in the two threaded bars diagonally at the lower section of the terminal box.
2. Slide the terminal box cover over the threaded bars onto the lower section of the terminal
box.
3. Screw the screws into the free holes and tighten by hand.
4. Release the threaded bars.
5. Tighten all four M10 screws, tightening torque 40 Nm.
6.4
Preparation
6.4.1
Terminal designation
According to IEC / EN 60034‑8, the following basic definitions apply to the terminal
designations for 3-phase machines:
Table 6-1
Terminal designations using the 1U1-1 as an example
1 U 1 - 1 Designation
x
Index for pole assignment for pole-changing machines where applicable. A lower
index signifies a lower speed. Special case for split winding.
x
Phase designation U, V, W
x
Index for winding start (1) or end (2) or if there is more than one connection per
winding
x Additional indices for cases in which it is obligatory to connect parallel power feed
cables to several terminals with otherwise identical designations
6.4.2
Selecting cables
Take the following criteria into account when selecting the connecting cables:
● Rated current
● Rated voltage
● Possibly a service factor
● System-dependent conditions, such as ambient temperature, routing type, cable cross-
section as defined by required length of cable, etc.
● Requirements according to IEC/EN 60204‑1
● Dimensioning for bundled cable routing, e.g. according to DIN VDE 0298 Part 4 or
IEC 60364-5-52
● Requirements according to IEC/EN 60079-14
● Configuration notes
Electrical connection
6.4 Preparation
SIMOTICS FD 1MQ1
76
Operating Instructions 01/2019
Содержание SIMOTICS FD 1MQ1
Страница 2: ...28 01 2019 14 14 V11 01 ...
Страница 48: ...Preparations for use 4 20 Converter operation SIMOTICS FD 1MQ1 48 Operating Instructions 01 2019 ...
Страница 108: ...Start up 7 11 Setting the motor parameters at the converter SIMOTICS FD 1MQ1 108 Operating Instructions 01 2019 ...
Страница 144: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1MQ1 144 Operating Instructions 01 2019 ...
Страница 166: ...Spare parts 10 19 Auxiliary terminal box 1XB302 SIMOTICS FD 1MQ1 166 Operating Instructions 01 2019 ...
Страница 170: ...Disposal 11 5 Disposal of components SIMOTICS FD 1MQ1 170 Operating Instructions 01 2019 ...
Страница 172: ...Service and Support SIMOTICS FD 1MQ1 172 Operating Instructions 01 2019 ...
Страница 176: ...Quality documents SIMOTICS FD 1MQ1 176 Operating Instructions 01 2019 ...
Страница 181: ......