Install the V ring
1. Grease the axial sealing surface. The shaft seating remains ungreased.
①
V ring
②
Mounting aid washer
③
Protective ring
Figure 9-3
Install the V ring
2. Push the V ring
①
onto the shaft using an assembly disk
②
.
The V ring is in the correct axial position when the face surface is flush with the outer edge
of the V ring.
Install the protective ring for IP56 degree of protection
For degree of protection IP56, the V ring for the outer bearing seal is fitted with a sheet steel
protective ring
③
in the bearing cover.
1. Push the protective ring onto the shaft.
2. Verify that the ring is sufficiently pretensioned. Replace the protective ring, if necessary.
3. Position the protective ring so that one of the longitudinal grooves meets the corresponding
water separation groove at the bottom in the bearing cover flange or end shield.
9.2.4.6
Installing the V ring ("Increased degree of protection" option)
The grease chamber of the labyrinth sealing ring together with the V ring ensures compliance
with degree of protection IP65.
Maintenance
9.2 Corrective Maintenance
SIMOTICS FD 1MQ1
140
Operating Instructions 01/2019
Содержание SIMOTICS FD 1MQ1
Страница 2: ...28 01 2019 14 14 V11 01 ...
Страница 48: ...Preparations for use 4 20 Converter operation SIMOTICS FD 1MQ1 48 Operating Instructions 01 2019 ...
Страница 108: ...Start up 7 11 Setting the motor parameters at the converter SIMOTICS FD 1MQ1 108 Operating Instructions 01 2019 ...
Страница 144: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1MQ1 144 Operating Instructions 01 2019 ...
Страница 166: ...Spare parts 10 19 Auxiliary terminal box 1XB302 SIMOTICS FD 1MQ1 166 Operating Instructions 01 2019 ...
Страница 170: ...Disposal 11 5 Disposal of components SIMOTICS FD 1MQ1 170 Operating Instructions 01 2019 ...
Страница 172: ...Service and Support SIMOTICS FD 1MQ1 172 Operating Instructions 01 2019 ...
Страница 176: ...Quality documents SIMOTICS FD 1MQ1 176 Operating Instructions 01 2019 ...
Страница 181: ......