Installation
5.2 Types of installation
SCALANCE XM-400
Operating Instructions, 09/2018, C79000-G8976-C306-08
47
5.2
Types of installation
Types of installation
You have the following options for the device:
●
DIN rail
●
S7-300 standard rail
●
S7-1500 standard rail
Installation clearance
Observe the following minimum clearances so that the convection ventilation of the device is
not blocked:
●
Below at least 10 cm
●
Above at least 10 cm
Installation location
Mount the devices horizontally so that the LED display is at the top left and the ventilation
openings are oriented up and down.
Horizontal
Horizontal installation of the rack (DIN rail).
Example of mounting position on
standard rail
Содержание SIMATIC NET SCALANCE XM-400
Страница 10: ...Introduction SCALANCE XM 400 10 Operating Instructions 09 2018 C79000 G8976 C306 08 ...
Страница 12: ...Safety notices SCALANCE XM 400 12 Operating Instructions 09 2018 C79000 G8976 C306 08 ...
Страница 18: ...Recommendations on network security SCALANCE XM 400 18 Operating Instructions 09 2018 C79000 G8976 C306 08 ...