Wiring
3-25
ET 200eco Distributed I/O Station
A5E00158716-02
Note
We recommend you wire the power supply with the cables specified in Appendix A
(order no.) ( 5x1.5 mm
2
with 7/8” connectors).
If you want to produce a self–made cable, we recommend you use a conductor
cross–section of 1.5 mm
2
.
How to wire the M12, 7/8” plug
1. Insert the plug (M12 or 7/8”) into the corresponding round socket on the
terminal block. Ensure that the plug and socket interlock (slot and groove).
2. Tighten the knurled screw of the plug.
Figure 3-9
How to wire the M12, 7/8” plug
Caution
It is not permitted to disconnect the 7/8” connector during ET 200eco runtime!
Always switch off the load voltage supply (2L+) before you disconnect the 7/8”
plug.
Содержание SIMATIC ET 200eco
Страница 8: ...Preface viii ET 200eco Distributed I O Station A5E00158716 02 ...
Страница 18: ...Product overview 1 6 ET 200eco Distributed I O Station A5E00158716 02 ...
Страница 70: ...Commissioning and diagnostics 4 16 ET 200eco Distributed I O Station A5E00158716 02 ...
Страница 116: ...I O address area C 6 ET 200eco Distributed I O Station A5E00158716 02 ...
Страница 124: ...Index Index 4 ET 200eco Distributed I O Station A5E00158716 02 ...