34
Instrument Transformers
Figure 30.
VT Fuse Rollout Tray Operating Sequence
A:
VT Rollout Tray in Connected Position. Handle/interlock
Bars Fully Extended to Secure Rollout Tray in Cell.
B:
Handle/interlock Bars Retracted, to Allow Rollout Tray to
be Withdrawn.
C:
Extension Rails Withdrawn to Fully Extended Position.
D:
VT Rollout Tray Withdrawn to Allow Inspection of Fuses.
1627-95
1628-95
1625-95
1624-95