Chapter 2
Installing Device
RUGGEDCOM RSG2100
Installation Guide
6
General Procedure
•
Section 2.2, “Required Tools and Materials”
•
Section 2.3, “Cabling Recommendations”
•
Section 2.4, “Installing the Device in Hazardous Locations”
•
Section 2.5, “Mounting the Device”
•
Section 2.6, “Connecting the Failsafe Alarm Relay”
•
Section 2.7, “Connecting Power”
•
Section 2.8, “Connecting to the Device”
•
Section 2.9, “Configuring the Device”
Section 2.1
General Procedure
The general procedure for installing the device is as follows:
1. Review the relevant certification information for any regulatory requirements. For more information, refer to
2. Mount the device.
3. Connect the failsafe alarm relay.
4. Connect power to the device and ground the device to safety Earth.
5. Connect the device to the network.
6. Configure the device.
Section 2.2
Required Tools and Materials
The following tools and materials are required to install the RUGGEDCOM RSG2100:
Tools/Materials
Purpose
AC power cord (16 AWG)
For connecting power to the device.
CAT-5 Ethernet cables
For connecting the device to the network.
Flathead screwdriver
For mounting the device to a DIN rail.
Phillips screwdriver
For mounting the device to a panel.
4 x #8-32 screws
For mounting the device to a panel.
Содержание RUGGEDCOM RSG2100
Страница 4: ...RUGGEDCOM RSG2100 Installation Guide iv ...
Страница 12: ...Chapter 1 Introduction RUGGEDCOM RSG2100 Installation Guide 4 Description ...
Страница 28: ...Chapter 2 Installing Device RUGGEDCOM RSG2100 Installation Guide 20 Configuring the Device ...
Страница 36: ...Chapter 3 Communication Ports RUGGEDCOM RSG2100 Installation Guide 28 Removing a GBIC Optical Port ...
Страница 46: ...Chapter 5 Dimension Drawings RUGGEDCOM RSG2100 Installation Guide 38 ...
Страница 54: ...Chapter 6 Certification RUGGEDCOM RSG2100 Installation Guide 46 EMC and Environmental Type Tests ...