RUGGEDCOM RS920W
Installation Guide
Chapter 2
Installing the Device
Connecting High AC/DC Power
11
CAUTION!
Electrical hazard – risk of damage to equipment. Before testing the dielectric strength (HIPOT) in the
field, remove the braided ground cable connected to the surge ground terminal and chassis ground.
This cable connects transient suppression circuitry to chassis ground and must be removed in order to
avoid damage to transient suppression circuitry during testing.
NOTE
Torque all terminal connections to 0.6 N·m (5 lbf-in).
1. Secure the power terminal block to the device.
2. Connect the positive wire from the power source to the positive/live (+/L) terminal on the terminal block.
4
1
2
3
Figure 5: Terminal Block Wiring
1.
Positive/Live (+/L) Terminal
2.
Negative/Neutral (-/N) Terminal
3.
Surge Ground Terminal
4.
Braided Ground Cable
Содержание RUGGEDCOM RS920W
Страница 4: ...RUGGEDCOM RS920W Installation Guide iv ...
Страница 10: ...Preface RUGGEDCOM RS920W Installation Guide x Customer Support ...
Страница 32: ...Chapter 4 Communication Ports RUGGEDCOM RS920W Installation Guide 22 Serial Ports ...
Страница 38: ...Chapter 5 Technical Specifications RUGGEDCOM RS920W Installation Guide 28 Dimension Drawings ...
Страница 44: ...Chapter 6 Certification RUGGEDCOM RS920W Installation Guide 34 EMC and Environmental Type Tests ...