background image

3 Device overview 
 

RobIn eBox Installation Manual 
Entry-ID: 109782794,    1.1.0,    04/2021 

 

 

 

©

 S

ie

m

e

n

s

 A

G

 2021

 A

ll r

ig

h

ts

 r

e

s

e

rv

e

d

 

3.1 

Content of RobIn eBox ECO cabinet 

 

RobIn eBox ECO control cabinet 

 

This document 

 

Circuit diagrams 

 

Wall-mounting fixes. 

 

3.2 

Technical data 

 

Table 3-1: : Technical data of RobIn eBox ECO control cabinet 

Parameter 

Value  

Color

 

RAL 7035 

IP 

IP54 

Dimension (H x W x D)

 

600 x 600 x 250mm  

Weight 

30 kg 

Grounding system

 

TN-S 

Input voltage

 

1AC 230 V / 50 Hz 

Rated current

 

10 A 

Rated control voltage

 

24VDC 

Operating temperature 

+5 ... +40 

°C 

Relative humidity 

40% ...50 %, 

at 25 °C / without condensation  

Main power plug 

 

(type/cable length)

 

Schuko (CEE 7/7) 230V / 3mts  
 

Data for external protection 
circuit breaker / fuse 

16A GL/GG 400V 
 

Ethernet Switch 

8x 10/100/1000 Mbit/s RJ45 ports  
(2 ports reserved for the cabinet itself,  
1 port for UR robot controller,  
5 ports available for user) 

Digital Input Specification 

16xDI 24V DC 

Digital Output Specification 

16xDQ 24V DC/ 0.5A 

PLC CPU 

SIEMENS CPU 1510SP-1 PN, 12MB, FW V2.8 
2 x Ethernet adapters 

UR robot controller 
Supported 

e-Series 

UR Polyscope version 
supported 

5.8 or superior 

 

 

 

Содержание RobIn eBox ECO

Страница 1: ...RobIn eBox ECO Installation manual RobIn eBox ECO V 1 1 control cabinet for UR robots https support industry siemens com cs ww en view 109782794 Siemens Industry Online Support ...

Страница 2: ...er will be used A notice warning of injury to persons with a safety alert symbol may also include a warning relating to property damage Qualified Personnel The product system described in this documentation may be operated only by personnel qualified for the specific task in accordance with the relevant documentation in particular its warning notices and safety instructions Qualified personnel are...

Страница 3: ...istic state of the art industrial security concept Siemens products and solutions only form one element of such a concept Customer is responsible to prevent unauthorized access to its plants systems machines and networks Systems machines and components should only be connected to the enterprise network or the internet if and to the extent necessary and with appropriate security measures e g use of...

Страница 4: ...1 Content of RobIn eBox ECO cabinet 9 3 2 Technical data 9 3 2 1 Simplified diagram 10 3 3 Cabinet components 11 4 Installation 12 4 1 Dimensional drawings 12 4 2 Connecting the grid 13 4 3 Cable entry 14 4 4 UR Robot connection 15 4 5 Service ports 16 5 Application example RobinEboxComm 16 5 1 TIA Portal project 17 5 2 URCap RobinEboxCommunicator 19 6 Appendix 21 6 1 Service and Support 21 6 2 Ap...

Страница 5: ...overview Purpose of the manual This document contains information about the installation of the RobIn eBox ECO control cabinet Core content The following core issues are covered in this document Safety Installation Required basic knowledge General knowledge in the area of electricity and PLC is required to understand this documentation ...

Страница 6: ...time specified on the warning labels has elapsed 4 Check that there is no voltage between any of the power connections and between any of the power connections and the protective conductor connection 5 Check that every auxiliary circuit is de energized 6 Ensure that the motors cannot move 7 Identify all other dangerous energy sources e g compressed air hydraulic systems or water Switch the energy ...

Страница 7: ...und connection For missing or incorrectly implemented protective conductor connection for devices with protection class I high voltages can be present at open exposed parts which when touched can result in death or severe injury Ground the device in compliance with the applicable regulations WARNING Unrecognized dangers due to missing or illegible warning labels Dangers might not be recognized if ...

Страница 8: ...provides all main components required for the integration of a PLC and industrial robots The Siemens RobIn eBox comes pre tested and it is ready to be connected to an UR Robot via Profinet The RobIn eBox comes with an URCap that allows to monitor first set up of the communication with the PLC from the UR teach pendant It also comes with a TIA portal application example project Figure 3 1 RobIn eBo...

Страница 9: ...30 V 50 Hz Rated current 10 A Rated control voltage 24VDC Operating temperature 5 40 C Relative humidity 40 50 at 25 C without condensation Main power plug type cable length Schuko CEE 7 7 230V 3mts Data for external protection circuit breaker fuse 16A GL GG 400V Ethernet Switch 8x 10 100 1000 Mbit s RJ45 ports 2 ports reserved for the cabinet itself 1 port for UR robot controller 5 ports availabl...

Страница 10: ...9782794 1 1 0 04 2021 10 Siemens AG 2021 All rights reserved 3 2 1 Simplified diagram Figure 3 2 RobIn eBox simplified diagram Robin eBox UR Robot controller Profinet Power supply 230 V 50 Hz I O Ethernet service port 230 V 50 Hz service port UR industrial robot ...

Страница 11: ...nection power socket to grid Main power switch 24VDC Power supply PLC I O Modules Ethernet switch Auxiliary components Terminal blocks circuit breakers coupling relays if needed etc Optional power socket on rear side Optional Ethernet RJ 45 connector on the rear side Optional Safety PLC Optional Siemens HMI Optional Ready for OEM controller from UR sold directly from UR The part list can be found ...

Страница 12: ...igure 4 1 Mechanical installation Please follow Rittal s manual Rittal_1590010_Instructions_3_7917 for more details of bracket installation Enough space should be ensured to allow air flow circulation and opening of the side ports NOTE Several wall mounting systems are available for this type of panel Rittal Compact Enclosure AX and the end user may use a different type of bracket according to it ...

Страница 13: ...1 13 Siemens AG 2021 All rights reserved 4 2 Connecting the grid The RobIn electrical cabinet can be plugged directly to the grid 230V with the provided cable cord Customer must ensure that the plug is fed by a circuit breaker rated 400V 16A Figure 4 2 RobIn 230 V power plug 1 1 ...

Страница 14: ...net Figure 4 3 Cable entry view from inside the cabinet Figure 4 4 Cable entry plate disassembly The Icotek slit KT grommet matching the cable diameter is placed around the cable and inserted into the cable entry frame Plugs are provided for unused grommet Figure 4 5 Cable grommet placed around For more information of installation of the cable you may check the manufacturer video https www youtube...

Страница 15: ...0 04 2021 15 Siemens AG 2021 All rights reserved 4 4 UR Robot connection UR robot can be connected to any free port of the ethernet switch As default the port 2 of the ethernet switch is used for the robot controller connection Figure 4 6 Profinet connection to UR robot ...

Страница 16: ...6 Siemens AG 2021 All rights reserved 5 Optional accessories 5 1 Service ports Optional The control cabinet can be provided with service ports for communication and power This port provides an ethernet port RJ45 and a 230V power socket Figure 5 1 RobIn eBox with service ports see 1 open 1 ...

Страница 17: ...nual_V1_1_0 pdf RobinEboxComm example project RobinEboxComm_Prj_V1_1_0 zip RobinEboxComm URCap RobinEboxCommunicator_urcap_V_1_1_0 zip 6 1 TIA Portal project The application example RobinEboxComm provides a TIA portal project with the PLC and the UR robot already configured in the TIA portal hardware configuration Figure 6 1 TIA Portal project with UR Profinet device The RobinEboxComm includes a P...

Страница 18: ...6 Application example RobinEboxComm RobIn eBox Installation Manual Entry ID 109782794 1 1 0 04 2021 18 Siemens AG 2021 All rights reserved Figure 6 2 Function RobinEboxComm called in OB1 ...

Страница 19: ... Polyscope The URCap reads the data sent by the PLC via Profinet and shows it in PolyScope NOTE The URCap can be downloaded from SIOS from the same entry where is this manual The procedure for installing the URCap into the robot controller is not part of this manual Figure 6 3 RobIn eBox URCap If the communication with the PLC and the robot is working properly the PLC firmware will be shown in Pol...

Страница 20: ...6 Application example RobinEboxComm RobIn eBox Installation Manual Entry ID 109782794 1 1 0 04 2021 20 Siemens AG 2021 All rights reserved Figure 6 4 Communication error or wrong PLC configuration ...

Страница 21: ...Industry provides you fast and competent support regarding all technical queries with numerous tailor made offers ranging from basic support to individual support contracts You send queries to Technical Support via Web form www siemens com industry supportrequest Service offer Our range of services includes inter alia the following Product trainings Plant data services Spare parts services Repair ...

Страница 22: ...to tech team motioncontrol siemens com 7 3 Related literature Table 7 1 Topic 1 Siemens Industry Online Support https support industry siemens com 2 Download page of this entry https support industry siemens com cs ww en view 109782794 3 Universal Robot Profinet guide https www universal robots com articles ur profinet guide 7 4 Change documentation Table 7 2 Version Date Modifications V1 0 08 202...

Отзывы: