
Checks and Adjustments
4 - 5
Siemens AG
SPR2-240.841.01
Page 5 of 6
POWERMOBIL
Medical Solutions
Rev. 01
05.03
CS PS 24
Checking the lifting column movement
4
•
The system is switched on.
•
Extend and retract the lifting column completely. At the same time, make sure that the
energy chain moves properly with it and there are no cables in the way of the mechani-
cally moving parts and make sure cables are not being crushed.
➪
The lifting column movement must stop on its own in its end positions.
Checking the orbital movement
4
•
Release the orbital brake.
•
Turn the C-arm into both orbital end positions.
➪
The cables of the cable module must be properly wound up and down on the
respective cable drum.
The C-arm must not move on its own accord in any position.
•
Turn the C-arm orbitally back into 0° position.
•
Reactivate the orbital brake.
Checking the angulation movement
4
•
Release the angulation brake.
•
Turn the C-arm into both angulation end positions.
➪
The cables around the angulation axis must move correctly.
➪
The cables must not be taut in the end positions of the angulation axis.
•
Turn the angulation back to the 0° position.
•
Reactivate the angulation brake.
Checking the horizontal movement
4
•
Release the horizontal movement brake.
•
Move the horizontal carriage from end position to end position.
➪
The force required should be approximately the same over the entire distance.
•
Move the horizontal carriage into several positions and release it.
➪
The horizontal carriage must not move on its own accord.
•
Reactivate the horizontal movement brake.
Emergency stop of motorized unit movements
4
•
Press the Emergency Stop switch
➪
The vertical lifting column and the motorized support of the orbital movement
must not operate any longer.
•
Unlock the Emergency Stop switch again.