Model PAD-5
1
Wiring and Configuring the PAD-5-MB
19
Siemens Industry, Inc.
A6V101030358_en--_c
Smart Infrastructure
3.2.1
Wiring Power Supply and Battery to the Main Unit
Power supply connection (170 W or 300 W)
Connection X100 must be used for either power supply.
.
Figure 8: FP2012-U1 (Doc. ID A6V10334250)
NOTE:
Check brownout switch for the power supply and select proper source voltage.
Figure 9: FP2011-U1 (Installation Instruction P/N 315-050222)
AC IN
120/240V
50/60Hz
ORANGE (PIN #1)
(+26VDC)
BLACK
(PIN #2)
(GND)
BROWN
(PIN #3) (PSSI)
WHITE
(PIN #4)
(ACPB)
TO X100