MOUNTING
(See Figure 10)
1. Use a standard 3
1
/
2
-inch deep, double
gang electrical switchbox or a 4-inch
square electrical box that is 2
1
/
2
inches
deep with either a 1
1
/
2
-inch deep
extension or a 1
1
/
4
-inch deep plaster ring
extension.
2. Connect the field wiring. Insert the ICP-B6
into the box and fasten the module plate
to the box.
Figure 10
Mounting the ICP-B6
NOTE:
When using the double gang
switchbox or the plaster ring
extension, use the same four
screws to fasten both the mod-
ule and the blank plate (user
supplied).
3. Cover the module front plate with a 4-inch
blank plate (user supplied) and fasten
with two plate screws.
P/N 315-095306-10
Siemens Industry, Inc.
Building Technologies Division
Florham Park, NJ
Siemens Building Technologies, Ltd.
Fire Safety & Security Products
2 Kenview Boulevard
Brampton, Ontario
L6T 5E4 Canada