
30/34
Siemens Building Technologies
PXM10 operator unit
CM110397en
Building Automation
31.08.2004
appear in the display panel in the form of the symbol shown
to the left.
A new special period is to be defined, which is to take effect
on New Year's Day, i.e. on 1
st
January of every year. The
calendar year values change annually. You should therefore
enter the date as follows:
01.01. ***
Example: