CP 1543-1
Operating Instructions, 12/2019, C79000-G8976-C289-08
87
Index
A
Autocrossing mechanism, 35
Autosensing, 35
C
Cell protection concept
VPN, 62
Commissioning
Completeness of the STEP 7 project data, 28
Configuration, 28
Configuration and downloading the configuration
data, 19
Connecting a switch, 35
Connection resources of the CPU, 15
Connections for Web
Quantity, 17
Crossover cable, 35
D
Data management - Configuration data, 78
DHCP, 78
Disposal, 6
Double addressing in the network, 36
Downloading project data, 28
Downloads, 10
E
E-mail, 11
E-mail connection, 16
EMC - electromagnetic compatibility, 81
Configuration via T_CONFIG, 20
Pin assignment, 29
F
S5/S7 addressing mode, 14
FETCH/WRITE connections, 16
Firewall, 14
Firmware version, 3
FTP, 35
Response if the reference to the FTP job block is
missing, 54
FTP (FTP client), 15
FTP client
Configuration limits, 18
FTP server
Configuration limits, 18
FTP_CMD, 45
Block execution time, 18
FTPS, 14
FTPS - Security, 42
G
Gateway (VPN), 65
Gigabit specification, 23
Glossary, 6
H
Hardware product version, 3
HMI communication, 11
I
Installation and commissioning, 28
Procedure, 28
Instruction
FTP_CMD, 20
T_CONFIG, 20
TCON, TSEND/TRCV, 20
TDISCON, 20
TMAIL_C, 20
TSEND_C/TRCV_C, 20
TUSEND/TURCV, 20
IP address
IPv6, 13
Via DHCP, 36
IP configuration
IPv4 / IPv6, 13
IP routing, 36
IPsec tunnel
Number, 18
ISO transport (complying with RFC 8073), 11
ISO transport connections, 16
ISO-on-TCP (acc. to RFC 1006), 11