background image

Document No. 546-00085  
Installation Instructions  
December 8, 2011 

Page 2 of 7

 

Siemens Industry, Inc.

 

Instructions 

1. 

If the Fume Hood Controller will be used with a 

field panel, then disconnect the 

Field Level 

Network (FLN) trunk from the 

field panel. 

 

2. 

Place the ESD wrist strap on your wrist and 
attach it to a good earth ground.  

3. 

Carefully remove the controller board from the 
anti-static bag.  

4. 

To mount the controller, do one of the following:  

 

Center the controller board over the 

mounting posts in the bottom of the 
controller enclosure (Figure 1). Insert the 
corner holes of the board onto the mounting 
posts. Press 

firmly on the board to snap it 

securely into place. Repeat for all 
controllers.  

 

Secure the mounting rail inside the 

enclosure at the controller’s desired 
location and snap it into place on the 
mounting rail (Figure 2). Repeat for all 
controllers.  

5.  After installing all controller boards, verify that 

power is OFF. Connect a certi

fied 24 Vac Class 

II power source to the Fume Hood Controller, 
see Figure 3.  

 

NOTE:

 

To meet CE requirements, the 
enclosuremust be grounded. 

 

Figure 3.  Power Trunk Wiring. 

6.  Connect the FLN trunk wiring as shown in 

Figure 4.  

7.  After all controllers are connected to the FLN 

reconnect the FLN trunk to the 

field panel. 

 

 

 

CAUTION 

Do not connect an earth ground 
to the FLN trunk shield terminal. 
The earth ground should be 
connected only at the field panel 
to prevent ground loop currents. 

 

Figure 4.  FLN Trunk Wiring. 

8.  Connect the point wiring for the appropriate 

Fume Hood Controller application as shown in 
Figure 7 and Figure 8. The wiring for sashes is 
shown in Figure 9 through Figure 14. Red/Signal 
and Black/Common polarity must be maintained 
on all sash sensors. Terminate both connections 
of a 24 Vac load directly to the controller board. 
The 24 Vac “H” terminal is switched through a 
triac to the NO terminations when the associated 
DO is energized. 

 

 

CAUTION 

The Fume Hood Controller DOs 
control 24 Vac loads only. The 
maximum rating is 12 VA for 
each DO. For higher ratings an 
interposing relay must be used. 

9.  Follow the instructions in Figure 5. 

 

 

CAUTION 

Ferrite filter(s) must be installed 
on the Operator Display Panel 
(ODP) cable. If not, the controller 
is not FCC and CE compliant. 

Содержание 941

Страница 1: ...irements and CE compliance Product Numbers 546 00705 CE Compliant Fume Hood Controller Application 941 and 942 with cover and mounting rail 546 00705E CE Compliant Fume Hood Controller Application 941 and 942 with FHC enclosure NOTE Keep the controller board in its static proof bag until you are ready to install Warning Caution Notation WARNING Personal injury loss of life may occur if you do not ...

Страница 2: ...Figure 3 NOTE To meet CE requirements the enclosuremust be grounded Figure 3 Power Trunk Wiring 6 Connect the FLN trunk wiring as shown in Figure 4 7 After all controllers are connected to the FLN reconnect the FLN trunk to the field panel CAUTION Do not connect an earth ground to the FLN trunk shield terminal The earth ground should be connected only at the field panel to prevent ground loop curre...

Страница 3: ...e Filter 10 Plug the Operator Display Panel cable into the Operator Display Panel Communication port on the controller board Figure 6 and Figure 7 NOTE The ferrite filter must be installed on the cable inside the enclosure to meet FCC and CE requirements Figure 6 Figure 6 Ferrite Filter Installed The installation is complete ...

Страница 4: ...Document No 546 00085 Installation Instructions December 8 2011 Page 4 of 7 Siemens Industry Inc Figure 7 Fume Hood Controller with Damper Wiring Application 941 ...

Страница 5: ...Document No 546 00085 Installation Instructions December 8 2011 Siemens Industry Inc Page 5 of 7 Figure 8 Fume Hood Controller with Venturi Air Valve Wiring Application 942 ...

Страница 6: ...t the wiring is reversed The sash closest to the connector is wired to Red and Black The sash farthest from the connector is wired to White and Black Figure 9 Single Vertical Sash Configuration Figure 10 Two Horizontal Sash Configuration Figure 11 Four Horizontal Sash Configuration Figure 12 Two Horizontal One Vertical Sash Configuration Figure 13 Four Horizontal One Vertical Sash Configuration ...

Страница 7: ...c Other product or company names mentioned herein may be the trademarks of their respective owners 2011 Siemens Industry Inc Siemens Industry Inc Building Technologies Division 1000 Deerfield Parkway Buffalo Grove IL 60089 4513 U S A Your feedback is important to us If you have comments about this document please send them to SBT_technical editor us sbt siemens com Document No 546 00085 Printed in...

Отзывы: