background image

Document No. 546-00085 

Installation Instructions  

December 8, 2011 

Information in this document is based on specifications believed correct at the time of publication. The right is reserved to make changes as 

design improvements are introduced. APOGEE and Insight are registered trademarks of Siemens Industry, Inc. Other product or company 

names mentioned herein may be the trademarks of their respective owners. © 2011 Siemens Industry, Inc.  
Siemens Industry, Inc. 

Building Technologies Division 

1000 Deerfield Parkway 

Buffalo Grove, IL 60089-4513 

U.S.A 

Your feedback is important to us. If you have 

comments about this document, please send them 

to [email protected]

Document No.546-00085  

Printed in the USA 

Page 7 of 7  

 

 

Figure 14.  2 Verticals and up to 8 Horizontals, Walk-in Sash Configuration Wiring Diagram. 

 

 

Содержание 941

Страница 1: ...irements and CE compliance Product Numbers 546 00705 CE Compliant Fume Hood Controller Application 941 and 942 with cover and mounting rail 546 00705E CE Compliant Fume Hood Controller Application 941 and 942 with FHC enclosure NOTE Keep the controller board in its static proof bag until you are ready to install Warning Caution Notation WARNING Personal injury loss of life may occur if you do not ...

Страница 2: ...Figure 3 NOTE To meet CE requirements the enclosuremust be grounded Figure 3 Power Trunk Wiring 6 Connect the FLN trunk wiring as shown in Figure 4 7 After all controllers are connected to the FLN reconnect the FLN trunk to the field panel CAUTION Do not connect an earth ground to the FLN trunk shield terminal The earth ground should be connected only at the field panel to prevent ground loop curre...

Страница 3: ...e Filter 10 Plug the Operator Display Panel cable into the Operator Display Panel Communication port on the controller board Figure 6 and Figure 7 NOTE The ferrite filter must be installed on the cable inside the enclosure to meet FCC and CE requirements Figure 6 Figure 6 Ferrite Filter Installed The installation is complete ...

Страница 4: ...Document No 546 00085 Installation Instructions December 8 2011 Page 4 of 7 Siemens Industry Inc Figure 7 Fume Hood Controller with Damper Wiring Application 941 ...

Страница 5: ...Document No 546 00085 Installation Instructions December 8 2011 Siemens Industry Inc Page 5 of 7 Figure 8 Fume Hood Controller with Venturi Air Valve Wiring Application 942 ...

Страница 6: ...t the wiring is reversed The sash closest to the connector is wired to Red and Black The sash farthest from the connector is wired to White and Black Figure 9 Single Vertical Sash Configuration Figure 10 Two Horizontal Sash Configuration Figure 11 Four Horizontal Sash Configuration Figure 12 Two Horizontal One Vertical Sash Configuration Figure 13 Four Horizontal One Vertical Sash Configuration ...

Страница 7: ...c Other product or company names mentioned herein may be the trademarks of their respective owners 2011 Siemens Industry Inc Siemens Industry Inc Building Technologies Division 1000 Deerfield Parkway Buffalo Grove IL 60089 4513 U S A Your feedback is important to us If you have comments about this document please send them to SBT_technical editor us sbt siemens com Document No 546 00085 Printed in...

Отзывы: