Installation | 7
79/174
500-8384.9 • Version 11 • Installation and Operating Instructions • 8DJH
4. Interconnect the two panels with 2 panel connecting bolts M8x40 at the upper panel
connection, but
do not bolt tight
.
Fig. 81:
Fitting the upper panel connecting
bolts
1
Panel connecting bolt (bolt-and-washer as-
sembly M8x45)
2
Nut-and-washer assembly M8
INFORMATION
For further installation of panels
with
7.15.2 Lining up panels without busbar coupling
For panels without busbar coupling, a gap between the side walls of the gas-filled switchgear
vessels results during the interconnection. To compensate this gap, vessel adapters must be
inserted between the panels.
The extension kit contains 2 vessel adapters.
Fig. 82:
Vessel adapters
☒
Mounting position of the vessel adapter:
The folded edge of the vessel adapter must point
towards the switchgear vessel.
1. If
one
of the panels is equipped with a switchgear vessel, insert
one
vessel adapter between
the panels.
2. If
both
of the panels are equipped with a switchgear vessel, insert
both
vessel adapters
between the panels.
Содержание 8DJH
Страница 173: ......