background image

Document Number 550-308 

Installation Instructions 

Rev. 1, July, 2001 

Siemens Building Technologies, Inc. 

Page 5 of 9

 

#8 TAPPING SCREW HOLE
11/64 (4) DIA. CLEARANCE

2-1/2 (64) CLEARANCE REQUIRED

FOR PROPER INSERTION OF

POLYETHYLENE TUBING

DIMENSIONS IN INCHES
MILLIMETERS IN PARENTHESES

4-1/8
(105)

10-29/32

(277)

3/16

(5)

TEC0319R1

C

L

11-9/32

(287)

1-27/32

(47)

1   2   3   4   5   6   7   8   9  10 11 12 13 14 15 16 17 18 19 20

+

-

S

 

Figure 3.  Mounting Dimensions. 

 
 
 

FLN TRUNK

RX TX

+

-

S

BST

RTS

(SHIELD)

(SHIELD)

(+)

(+)

(-)

(-)

TEC0272R2

 

NOTE:

 DO NOT ground the shield. 

24 V-AC

H

C

GND

DO1

DO2

DO3

DO4

DO5

NO C NO C NO C NO C NO C NO 

1   2   3   4   5   6   7   8   9  10 11 12

1   2   3   4   5   6   7   8   9  10 11 1

COMMON

24 VAC HOT

EARTH GND

CONTROLLER POWER WIRING

TEC0273R1

 

Figure 4.  FLN Wiring. 

 

Figure 5.  Power Trunk Wiring. 

 

 

Содержание 550-506

Страница 1: ...50 ft 15 2 m 588 100C 2 RJ11 room temperature sensor cable 100 ft 30 48 m 550 705 clamp on ferrite filter 10 pack Caution Notation CAUTION Equipment damage or loss of data may occur if the user does not follow procedure as specified Required Tools Electro Static Discharge ESD wrist strap Small flat blade screwdriver Medium flat blade screwdriver Medium duty electric drill 1 4 inch 6 35 mm hex nut ...

Страница 2: ... 6 or No 8 screws 3 Place the ESD wrist strap on your wrist and attach it to a good earth ground 4 Carefully remove the controller assembly from the anti static bag Center it over the mounting rail and snap it securely into place 5 Connect the Floor Level Network FLN See Figure 4 6 Connect the point wiring as shown in Figure 7 NOTE Wiring to DI3 AI3 requires a clamp on ferrite filter Figure 6 Stra...

Страница 3: ...ield panel If the old controller does not communicate with the field panel but communicates with CIS or is stand alone record the initial values in Table 1 If the old controller is not communicating or has a newer firmware revision use the following steps to update the field panel a Obtain a field panel Point Definition Report for the LCTLR point Record the values in Table 1 b View the initial val...

Страница 4: ... the new controller the field panel will automatically send the initial values down to the new controller Once this takes place replacement is complete If you manually recorded the initial values in the table then enter them into the new controller If a field panel is present then update the controller s initial values Replacement is complete If there was no communication at the old controller or ...

Страница 5: ...ARENTHESES 4 1 8 105 10 29 32 277 3 16 5 TEC0319R1 C L 11 9 32 287 1 27 32 47 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 S Figure 3 Mounting Dimensions FLN TRUNK RX TX S BST RTS SHIELD SHIELD TEC0272R2 NOTE DO NOT ground the shield 24 V AC H C GND DO1 DO2 DO3 DO4 DO5 NO C NO C NO C NO C NO C NO 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 1 COMMON 24 VAC HOT EARTH GND CONTROLLER POWE...

Страница 6: ...or point wiring for AI3 DI3 approximately 1 cm from the end 2 Wind the cable tightly twice around the filter 3 Close the filter and wrap it with a zip tie covering wound cable Figure 6 Adding Ferrite Filter s for CE Compliance CAUTION Ferrite filter s must be installed on the room temperature sensor RTS cable and any wiring to AI3 DI3 If not the controller is not CE compliant ...

Страница 7: ... 2 DO 7 NO C DO 8 NO C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 C H GND S E H C Y1 G Y2 CW COMMON CCW COLD DUCT DAMPER ACTUATOR Y1 G Y2 CW COMMON CCW HOT DUCT DAMPER ACTUATOR ELECTRIC HEAT STAGE 2 OPTIONAL OR SPARE DO ELECTRIC HEAT STAGE 1 OPTIONAL OR SPARE DO AVS 2 AUTOZERO MODULE OPTIONAL OR SPARE DO Figure 7 Point Wiring for Applications 2237 2238 2267 and 2268 with Electric Reheat 1 ...

Страница 8: ... 12 13 14 15 16 17 18 19 20 C H GND S E H C Y1 G Y2 CW COMMON CCW COLD DUCT DAMPER ACTUATOR Y1 G Y2 CW COMMON CCW HOT DUCT DAMPER ACTUATOR ELECTRIC HEAT STAGE 2 OPTIONAL OR SPARE DO ELECTRIC HEAT STAGE 1 OPTIONAL OR SPARE DO AVS 2 AUTOZERO MODULE OPTIONAL OR SPARE DO DUCT TEMPERATURE SENSOR 100K THERMISTOR OPTIONAL Figure 9 Point Wiring for Application 2269 with Electric Reheat 1 2 3 4 5 6 7 8 9 1...

Страница 9: ...IL 60089 4513 U S A Your feedback is important to us If you have comments about this document please send them to technical editor sbt siemens com Document No 550 308 Printed in the U S A Page 9 NOTE Record only those points marked with an asterisk on the CIS display Use F3 Look to identify the initial value for each point marked with an asterisk You may want to make extra copies of this table for...

Отзывы: