background image

540-219
Installations Instructions
Rev. 2, 1/99

P

P

P

Pa

a

a

age 

ge 

ge 

ge 4

4

4

4    o

o

o

of 

f 8

8

8

8

Siemens Building Technologies, Inc.

Landis Division

i.

 

Plug, in order, the controller’s:

 

pre-wired LAN trunk

 

DO8, AI3, and DI2

j.

 

If the old controller has the RTS plug
between the LAN trunk and point
terminations, then rewire power to the
power trunk terminal block. If the old
controller has the RTS plug on the opposite
end of the board from the power trunk
terminal block, then plug the power trunk
terminal block from the old controller into
the new controller.

k.

 

Connect the room temperature sensor. Run
the wiring through knockout.

l.

 

Power up the controller.

The following tasks can be performed by the
fitter:

m.

 

Label and remove the polyethylene tubing
from the old enclosure.

n.

 

After the new enclosure is in place,
reconnect the polyethylene tubing.

The following tasks can be performed by the system
specialist:

4.

 

Set the address and application at the new
controller.

5.

 

Based on what you did in Step 2, do one

one

one

one of the

following:

 

If you updated the initial values from the old
controller at the field panel, then when you
set the address and application for the new
controller, the field panel will automatically
send the initial values down to the new
controller. Once this takes place,
replacement is complete.

 

If you manually recorded the initial values in
the table, then enter them into the new
controller. If a field panel is present, then
update the controller’s initial values.
Replacement is complete.

 

If there was no communication at the old
controller, or the new controller has a newer
firmware revision than the old controller,
then enter the initial values into the new
controller. At the field panel, add the LCTLR
point and update the controller’s initial
values. The replacement is complete.

F

F

F

Fiiiigu

gu

gu

gurrrre 

e 2

2

2

2.  

.  

.  

.  R

R

R

Roo

oo

oo

oom 

m P

P

P

Prrrre

e

e

ess

ss

ss

ssu

u

u

urrrriiiizzzza

a

a

attttiiiion 

on 

on 

on C

C

C

Con

on

on

ontr

tr

tr

tro

o

o

oll

llll

lle

e

e

er 

r – 

– 

– 

– P

P

P

Pneu

neu

neu

neum

m

m

ma

a

a

attttiiiic 

c O

O

O

Ou

u

u

uttttp

p

p

pu

u

u

ut 

t w

w

w

wiiiitttth 

h A

A

A

Au

u

u

utttto

o

o

oz

zz

ze

e

e

errrro 

o M

M

M

Mo

o

o

od

d

d

du

u

u

ulllle

e

e

es

s

s

s....

Содержание 540-716

Страница 1: ... Pr r r re e e er r r requ equ equ equisi isi isi isit t t te e e es s s s Room temperature sensor installed optional Air velocity sensors installed in ducts A source of 24 Vac Class 2 power available Supply power to the unit is OFF An air supply line is available at the controller E E E Ex x x xpe pe pe pec c c ct t t ted ed ed ed I I I In n n ns s s st t t ta a a all ll ll lla a a at t t ti i i ...

Страница 2: ...e application Refer to Figure 6 Refer to Table 1 for application descriptions Run the wiring through knockout C C C CA A A AU U U UT T T TI I I IO O O ON N N N The Controller s Digital Outputs DOs control 24 Vac loads only The maximum rating is 12 VA for each DO For higher VA requirements 110 or 220 Vac requirements separate transformers used to power the load or DC power requirements use an inter...

Страница 3: ...tial values at the field panel If the old controller does not communicate with the field panel but communicates with the CIS or if the controller is stand alone then record the initial values those marked with an asterisk on the CIS display Record these values in Table 3 at the end of these instructions If the old controller is not communicating at all or if the controller you are installing has a...

Страница 4: ...wing If you updated the initial values from the old controller at the field panel then when you set the address and application for the new controller the field panel will automatically send the initial values down to the new controller Once this takes place replacement is complete If you manually recorded the initial values in the table then enter them into the new controller If a field panel is ...

Страница 5: ...ions Rev 2 1 99 Siemens Building Technologies Inc P P P Pa a a age ge ge ge 5 5 5 5 o o o of f f f 8 8 8 8 Landis Division F F F Fi ii igu gu gu gur r r re e e e 3 3 3 3 D D D Di ii im m m men en en ens s s si ii ion on on ons s s s ...

Страница 6: ... Tr r r run un un unk k k k W W W Wi ii ir r r ri ii ing ng ng ng 24 V AC C H DO 1 DO 2 DO 3 DO 4 DO 5 NO C NO C NO C NO C NO C DO 6 DO 7 NO C NO C DO 8 NO C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 COMMON 24 VAC HOT CONTROLLER POWER WIRING NOTE NO EARTH GROUND CONNECTION REQUIRED TEC0047R2 F F F Fi ii igu gu gu gur r r re e e e 5 5 5 5 P P P Po o o ow w w we e e e...

Страница 7: ...or 220 Vac requirements separate transformers used to power the load or DC power requirements use an interposing 220 V 4 relay module TEC Relay Module P N 540 147 N N N NO O O OT T T TE E E E Refer to the unit wiring diagrams or consult with the local representative if terminations are missing or are different 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ROOM TEMPERATURE SENSOR PRESSURE MODE...

Страница 8: ...th an asterisk You may want to make extra copies of this table for other controllers C C C Con on on ontr tr tr tro o o oll ll ll lle e e er r r r n n n na a a am m m me e e e a a a an n n nd d d d l ll lo o o oca ca ca cat t t ti ii ion on on on _________________________________________________________________________ T T T Ta a a ab b b bl ll le e e e 3 3 3 3 R R R Re e e ec c c co o o or r r rd...

Отзывы: