POLYMOBIL Plus
SPR8-125.034.02
Page 4 of 10
Siemens AG
Rev. 02
03.05
CS PS 24
Medical Solutions
1 - 4
Requirements
•
Connect the POLYMOBIL Plus only to a line voltage supply (receptacle) that complies
with the requirements of VDE 0107 or corresponds to the local national standards.
•
Disconnect the POLYMOBIL Plus at the line voltage
OFF
switch on the operating
console and disconnect the
line voltage plug
prior to any service work.
•
Remove or insert boards with the generator switched OFF only; observe
ESD guidelines when handling boards.
Important start-up information
1
•
After completion of the start-up procedure, the POLYMOBIL Plus which has been
completely tested and adjusted at the factory, is ready to operate.
•
The POLYMOBIL Plus can be connected to nominal line voltages from 110 V AC through
230 V AC (
±
10%) and automatically self-adjusts to the existing power line voltage.
•
After start-up, country-specific tests are to be performed, if required;
e.g. acceptance test according to RöV (Germany - X-ray ordinance).
Acceptance test according to RöV (Germany):
Required measurements can be partially transferred from the test protocol provided.
The following values are measured at the factory and recorded in the test certificate:
- Light localizer brightness
- Filter values - visual check
- Coincidence of light field and radiation field
- X-ray tube voltage accuracy
- mAs value check
- Reproducibility of the radiation
•
Adhere to the fuse ratings for the on-site receptacle:
- 16A slow-blow (on-site) at 110V
±
10% or 230V
±
10% line
voltage.
•
The line voltage cable of the POLYMOBIL Plus is supplied with a
(Schuko) safety plug.
Install line voltage plugs that comply with the local standards, if
required.
NOTE