18
SRV(P)80/185T - SRL(P)80/185T - SRV(P)100/185T
-
SRL(P)100/185T
1.0.5 - Sept. 2014
Example of the control wiring with S-link system for boats with
one control position and one retractable thruster.
S
1=
__
__
_
pos & neg
+ ground
BB1=___
BB2=___
S
2=
__
__
_
You need:
2 x 6 1327 End terminators
3 x 6 1326 T-connectors
1 x 6 1328 Power spur
2 x 6 1320-xxM Backbone cables
2 x 6 1321-xxM Spur cables
NO
EN
S-link planlegging og forbehold
S-link planning & precautions
Routing the Backbone:
Plan routing of the backbone so that lenght of spur cables will be kept at
a minimum.
Avoid routing the S-link cables close to equipment that might cause
interference to the S-link signals, such as radio transmitter equipment,
antennas, high voltage cables etc.
The backbone MUST be terminated in each end with the 6 1327 End
Terminator.
Spur cables:
Spur cables can be left unterminated (i.e. routing can be prepared for
future additional equipment), make sure to protect open connectors from
water and moisture to avoid corrosion in connector .
Ruting av Backbone:
Planlegg leggingen av “backbone”-kabelen slik at lengdene på “spur”-ka
-
blene blir kortest mulig.
Unngå å legge S-link kabelene i nærheten av ledninger eller utstyr som
kan skape forstyrrelser for S-link signalene, slik som radiosendere, anten-
ner, høyspentkabler etc.
“Backbone”-kabelen MÅ termineres i begge ender med 6 1327 “Termina
-
torplugg”
Spur kabler:
“Spur”-kabler kan kobles til “backbone”-kabelen uten å termineres (f.eks
for klargjøring av fremtidig tilleggsutstyr), sørg for for å beskytte de åpne
kontaktene mot fukt for å forhindre korrosjon i kontakten.
Positive, Negative
& Shield
Содержание SEP 80/185 T
Страница 29: ...29 SRV P 80 185T SRL P 80 185T SRV P 100 185T SRL P 100 185T 1 0 5 Sept 2014 Notes ...
Страница 30: ...30 SRV P 80 185T SRL P 80 185T SRV P 100 185T SRL P 100 185T 1 0 5 Sept 2014 Notes ...
Страница 31: ...31 SRV P 80 185T SRL P 80 185T SRV P 100 185T SRL P 100 185T 1 0 5 Sept 2014 Notes ...