
COMMISSIONING
6
41
80251340/2020-02-03|SICK
Subject to change without notice
T R A N S L A T I O N O F T H E O R I G I N A L O P E R A T I N G I N S T R U C T I O N S | VMS6200
6.2
Checking the operational readiness of the system components
The
DEVICE READY
LED lights up.
Fig. 30: MSC800 operational readiness
Power LED lights up.
Fig. 31: VMC800 operational readiness
Green LED lights up.
Fig. 32: Operational readiness of the LMS500
▸
The reflector and photoelectric sensor are correctly aligned to one another.
▸
The available sensing range is sufficient.
The green and yellow LED receive indicators light up.
Fig. 33: Operational readiness of the photoelectric retro-reflective sensor (in this case WL-18)
MSC800
VMC800
LMS500
Photoelectric retro-
reflective sensor