
24
8015383/ZUQ7/V1-3/2020-06 | SICK
O P E R A T I N G I N S T R U C T I O N S | TRANSIC151LP
Subject to change without notice
3
INSTALLATION
Installing the sample gas line
1
Provide adequate support for the tubing, for example by attaching it to the wall.
The tube must not put any traction on the connection.
2
The sample gas cell has two gas connections. Use the gas connection closest to the
TRANSIC151LP as gas inlet. This provides a better gas exchange and shorter response
times.
Installing the sample gas cell
Dimensions of the TRANSIC151LP with sample gas cell,
bracket and sample gas cell (suitable for PS=10 bar(g))”, page 71
When a TRANSIC151LP with sample gas cell is ordered, it is delivered with the cell fixed at
the factory and prepared for wall fitting.
▸
Take the sample gas cell off to check and replace the filter.
1
Loosen the bayonet tube screw fitting,
see “Removing the sample gas cell”, page 24
turn the sample gas cell and then pull it off the TRANSIC151LP,
2
Refit the bayonet screw fitting in the reverse sequence.
Ensure the seal is located between the sample gas cell and measuring device
enclosure. The Swagelok connections must point directly downwards.
Fig. 8: Removing the sample gas cell