5
Mounting
5.1
Overview of mounting procedure
NOTE
The mounting procedure described here for the device meets the requirements for use
in the target system.
Additional or different requirements may become necessary in the laboratory and dur‐
ing preparation, and should be taken into account as necessary,
. If you have any questions or anything remains unclear in this regard, please
contact our service team.
•
Mounting the device.
•
Connect the cables.
•
Connecting peripheral devices.
•
Connecting the voltage supply.
5.2
Scope of delivery
•
SIM200
•
20 port labels
•
Safety note
•
Optional: ordered accessories
NOTE
For a list of cables suitable for use with the device, see:
5.3
Preparing for mounting
Installation requirements
•
Select the mounting site: Plan space requirements and sufficient distance from
other devices. Be aware of the possibility of heat dissipation.
•
Unpack the device and allow to acclimatize to avoid formation of condensation.
•
Prepare vibration reduction measures, if necessary.
Preparing for mounting
1.
Place the device at the mounting site.
2.
Mark the mounting holes.
3.
Proceed to drill the mounting holes.
5.4
Mounting the device
NOTE
The coating around the mounting screws must be removed for the ground connection to
the housing.
•
Set the device on the mounting site.
•
Fasten device with two M6 screws (max. 0.8 Nm) and corresponding washers on
opposite device sides.
5
MOUNTING
14
O P E R A T I N G I N S T R U C T I O N S | SIM200
8026126//2020-10-15 | SICK
Subject to change without notice