7
Commissioning
7.1
Overview of commissioning steps
■
Connect the voltage supply.
■
Commission the sensor using the factory settings.
■
Configure the sensor.
7.2
Commissioning the sensor for the first time
1.
Connect the voltage supply.
2.
Wait until the yellow LED stops flashing (sensor is ready for operation).
The magnet may need to be moved inside the measuring range in order to be
taught into the sensor.
NOTE
When the sensor is ready for operation and a sufficiently strong magnet field is
registered in the measuring range, the LED lights up permanently. The yellow LED
goes out if no magnet is registered in the measuring range.
The yellow LED flashes at 4 Hz if an error is detected.
The sensor is supplied with the following settings, made at the factory:
■
Current output active (analog), IO-Link operation possible
■
Measuring range fully active
To configure the sensor, either the capacitive keypad (
IO-Link is used.
COMMISSIONING
7
8019721.1FIH/2022-06-01 | SICK
O P E R A T I N G I N S T R U C T I O N S | MPS-C
17