Page
All Rights Reserved
Shyam Telecom Limited
31/43
Next Generation
Signal Enhancement
8.
I
nstallation
8.1. P
reparation
S
heet-
P
re
I
nstallation
B
efore the installation commences, a preparation sheet to examine the various
requirements is to be compiled as per detail given below:
1. G
eneral
A
pplication:
O
utdoor
S
ervice
B
and
1
:
F
requency
B
and
DL
-
F
requency
B
and
UL-
S
ervice
B
and
2
:
F
requency
B
and
DL-
F
requency
B
and
UL-
N
umber
O
f
S
ub
B
ands: six
S
ub
B
and
1: F
requency
B
and
DL- UL-
S
ub
B
and
2: F
requency
B
and
DL- UL-
S
ub
B
and
3: F
requency
B
and
DL- UL-
S
ub
B
and
4: F
requency
B
and
DL- UL-
S
ub
B
and
5: F
requency
B
and
DL- UL-
S
ub
B
and
6: F
requency
B
and
DL- UL-
2.
T
echnical requirements
S.N
O.
R
equirement
R
emarks
1. E
stimated received signal strength available at
site where donor antenna is to be installed
2. E
stimated cable loss from donor antenna to the
repeater unit
3. E
stimated
DL RF
power to the input to the
repeater
4. D
esired
RF
P
ower in
DL
5. P
roposed gain settings in
DL
path
6. A
ttenuator to be inserted in
DL
path
7. E
stimated cable loss from repeater unit to
server antenna port
8. ERP
at server antenna
9. D
esired
RF
P
ower in
UL
10. P
roposed gain settings in
UL
path
11. A
ttenuator to be inserted in
UL
path
3.
P
roposed site
A
ddress: ---------------------------
Requirement
Remarks
S.No.