background image

Shuttle Brewers & Airpot/Shuttle Brewers

Page 7

Adjustments

All adjustments to machine are accessible through the front display(s). Refer to specifics below and the
Programming Routine section. All values are preset at the factory and may vary brewer to brewer.

Temperature Adjustment

Tank temperature can be adjusted from 170°F – 205°F (77°C – 96°C) through the front display. See Programming
Routine section for procedure.

Note:

On twin head brewers, the left display setting controls the tank temperature. The right display setting should

be set to the same value for the ready lights to be consistent.

Brew Volume “br”

Brew time can be set for each size visually. See Setting Brew Volume Procedure below.
Brew time can also be adjusted through the display. See Programming Routine section.

Setting Brew Volume Visually

1. Remove brew basket and place container under brew head.
2. Press and hold desired brew button for 5 seconds. Display will read “Pro”.
3. Within 10 seconds, press and release desired brew button. Water will dispense from spray head and time

will count-up in display.

4. When volume is at desired amount, press and release brew button to stop flow. Time will flash in display.
5. Within 20 seconds, press and release desired brew button. Display will clear and brew time will be stored

into memory.

Note:

During this routine, no pulsing or bypass will occur.

Note: 

If the On/Off button is pressed during procedure, time setting will default to previous time.

Pulse Brewing “P-b”

Within the Programming Routine, the number of pulses, pulse-on-time, and pulse-off-time for each size brew cycle
can be set. During the pulse-off cycle, water shuts off to the coffee grounds. During this period, the grounds in the
brew basket absorb water causing the coffee bed to rise. With a larger bed of coffee in the brew basket, remaining
water from spray head has more contact area with grounds causing greater extraction of finished coffee.

Note:

Adjusting pulse values will not affect the finished brew volume. The brew time, however, will be automatically

extended by the amount of total pulse OFF time.
See Brew Routine Section for examples.

Ratio “rto”

The ratio of the bypass flow rate versus the spray head flow rate is factory set. This number, however, can be 
adjusted if needed.
To find the proper value for the ratio:
1. Within the Programming Routine, set the bypass % to the maximum number allowable.
2. Remove the brew basket.
3. Prepare two containers to measure volume from both the spray head and bypass.
4. Press “Large” brew button to begin dispensing water.
5. After a minute or two, cancel the brew cycle by pressing the “Large” brew button or pressing the On/Off button.
6. Measure the volume of both containers.
7. Divide the bypass amount by the spray head amount. This number is to be entered as the new ratio (ex. “.45”).
8. Access the settings routine and adjust to the new ratio number.

Note:

If the ratio number is accurate, changing the bypass percent will not require resetting brew time.

Note:

Approximate ratio numbers:

.45 for standard spray head models

.64 for gourmet spray head models

Содержание PB-330

Страница 1: ...lling Problems 15 Heating Problems 17 Brewing Problems 19 Parts List 22 Parts Photos 23 PBIC PBVSA Cleaning and Sanitizing 26 Wiring Diagrams 28 Grindmaster Corporation 2004 PRINTED IN U S A Grindmaster Corporation 4003 Collins Lane Louisville KY 40245 USA 502 425 4776 800 695 4500 USA Canada only 800 568 5715 Technical Service Only FAX 502 425 4664 www grindmaster com 0206 Form AM 344 03 Part A09...

Страница 2: ......

Страница 3: ...h panel and lid of machine Located on PB 330 PB 330E 230V PB 430 and PB 430E 230V lower front decal Order part A546 434 for PB 330 Order part A546 435 for PB 430 Part A546 213 Located on front splash panel Part A71949 Located on brew baskets Shuttle Brewers Airpot Shuttle Brewers Page 3 CAUTION Remove with care Hot liquid in brew basket could cause burns Located on PBIC 330 PBIC 330E 230V PBIC 430...

Страница 4: ...tric and water hook up locations are behind the front panel Remove the four screws fastening this panel for access to these connections Water Hook up 1 The water line may enter through holes on the rear or the bottom of the brewer Use the right hand opening for water 2 Use 3 8 copper or flexible water line to prevent strain Do not use low temperature plastic tubing The connection to the fill valve...

Страница 5: ...ly copper conductors 4 Standard connection is 1 phase 3 wire Connect the two lines to L1 and L2 on the terminal block If the brewer is wired for three phase a lug L3 is provided on the terminal block A neutral line must be connected to the N terminal Note PB xxxE 230V models are 1 phase 2 wire or 3 phase 3 wire and do not require a neutral 5 The body of the brewer must be grounded A ground lug is ...

Страница 6: ...the filter basket Follow corporate recommendations for amount of coffee and grind A full Shuttle is 1 5 gallons 5 7L A full vacuum Shuttle is 1 6 6 0L gallons 5 Slide the basket into the brewer making sure the spout lines up with the top of the Shuttle 6 If ready lights are lit press correct batch size button 7 Brew spray time is about 4 minutes for a full Shuttle After the brew allow the coffee t...

Страница 7: ...default to previous time Pulse Brewing P b Within the Programming Routine the number of pulses pulse on time and pulse off time for each size brew cycle can be set During the pulse off cycle water shuts off to the coffee grounds During this period the grounds in the brew basket absorb water causing the coffee bed to rise With a larger bed of coffee in the brew basket remaining water from spray hea...

Страница 8: ...Valve closes Pulse 1 14 0 35 Brew Valve opens 15 0 55 Brew Valve closes Pulse 2 16 1 10 Brew Valve opens 17 1 30 Brew Valve closes Pulse 3 18 1 45 Brew Valve opens 19 4 45 Brew Valve closes 10 6 15 Ready Light stops flashing Pulse Brewing OFF Bypass ON Assumptions br 4 00 P b OFF rto 0 45 b P 20 max 31 Software calculates Brew valve on time 192 sec and Bypass Valve on time 107 sec 11 Press Brew bu...

Страница 9: ...f pulses Default is 1 18 Press up or down arrow to change value increments of 1 19 Press Large Brew button to accept and go to next setting Note If OFF is selected skip pulse timing steps to 26 20 Display will read 0 05 0 60 pulse ON time for each pulse Default is 0 40 21 Press up or down arrow to change value increments of one second 22 Press Large Brew button to accept and go to next setting 23 ...

Страница 10: ...E 0 05 0 60 OF PULSES OR OR PULSE OFF TIME 0 05 0 60 BYPASS RATIO 0 20 1 25 PULSE BREW BREW TIME TEMP SCALE ADJUST DISPLAY READING ADVANCE L L L L L BREW TIME 0 01 6 00 L L L L L L MAX CHANGE DEPENDING ON RATIO BYPASS FLOW RATE DIV BY SPRAY HEAD FLOW RATE 1 PRESS AND HOLD UP DOWN ARROWS FOR 5 SECONDS 2 READY LIGHTS WILL FLASH 3 PRESS BREW BUTTON FOR LARGE L 4 LARGE READY LIGHT FLASHES THROUGHOUT R...

Страница 11: ...f Off is selected skip pulse timing steps 14 Display will read 0 05 0 60 pulse ON time for each pulse Default is 0 30 15 Press up or down arrow to change value increments of 1 second 16 Press Medium Brew button to accept and go to next setting 17 Display will read 0 05 0 60 pulse OFF time for each pulse Default is 0 30 18 Press up or down arrow to change value increments of 1 second 19 Press Mediu...

Страница 12: ...crements of 1 13 Press Small Brew button to accept and go to next setting Note If Off is selected skip pulse timing steps 14 Display will read 0 05 0 60 pulse ON time for each pulse Default is 0 20 15 Press up or down arrow to change value increments of 1 second 16 Press Small Brew button to accept and go to next setting 17 Display will read 0 05 0 60 pulse OFF time for each pulse Default is 0 20 ...

Страница 13: ...s with one gallon 2 3 full of hot water 12 Pour into the Shuttle liners the recommended concentration of urn cleaner excessive amounts of cleaner will attack the stainless steel Urn cleaners that have been used successfully DIP IT TABZ Super Concentrate manufactured by Reckitt Benckiser Inc manufactured by Urnex Brands Inc 1655 Valley Road 170 Ludlow Street Wayne NJ 07474 Yonkers NY 10705 800 228 ...

Страница 14: ...Brewer may contain over 5 gallons 19 0L of hot water 1 Prepare a heat resistant container to drain tank water into 2 Disconnect power to the brewer 3 Remove the front access panel 4 Pinch or clamp the silicone hose connected to fill valve 5 Disconnect hose from outlet barb on fill valve 6 Place hose over drain and release clamp 7 Allow the tank to drain completely NOTE It may be necessary to pinch...

Страница 15: ...s securely connected Secure connections and reset controller If error reoccurs replace thermistor ER3 Thermistor is reading out of range Check tank temperature Replace thermistor Filling Problems Problem Possible Causes Service Check Remedy Overfilling water tank when power is Off Fill valve not sealing properly Check to see if water enters tank continuously usually at a slow rate Disassemble valv...

Страница 16: ...here is proper voltage across terminal block Check wiring diagram for more information Disconnect quick disconnect on secondary side of transformer at quick disconnect between yellow pink and blue wires Check for 12 Vac between pink wire and other wires Check for 24 Vac between blue and yellow wires Establish electrical power to unit Establish water supply to unit If there is not 120V across prima...

Страница 17: ...re and there is 24 Vac across fill valve terminals replace fill valve Heating Problems Problem Possible Causes Service Check Remedy Tank does not heat No electrical power to equipment No power to control board Check for proper voltage at terminal block Check circuit breaker on supply circuit Check for proper voltage across transformer primary terminals by disconnecting terminals See wiring diagram...

Страница 18: ...o ensure connections from relay to thermal cut out and from thermal cut out to contactor and from contactor to proper ter minal of terminal block are secure See wiring diagram for more info mation Ensure that coil on heater relay is energized by ensuring that there is 12 VDC between the gray wires attached to the relay Remove the black and brown wires from the relay and check for an open circuit a...

Страница 19: ...tions between N terminal of contactor coil and terminal block If the contactor coil is energized and there is an open circuit across any of the contactor poles replace contactor If resistance is much less than 8 Ohms or much more than 15 Ohms replace heater s If 6 pin connector is securely attached to control board and all connections are secure and functioning except there is not 120 Vac across c...

Страница 20: ... operating Plumb water supply so that water pressure is not significantly affected by other appliances Brew cycle will not start Optional momentary switch to indicate container in place not engaged or faulty Brew circuit connections not secure Brew valve faulty Touchpad faulty Check to see that container fully engages switch Check for continuity across switch when switch is engaged Check to see th...

Страница 21: ...l board Sprayhead will not stop dripping water Brew valve not closing completely Water in tank boiling Visually inspect brew valve at hose connections Remove sprayhead and determine if drip is coming from overflow Clean lime from valve Seat cup or entire valve may need replacement Reduce tank temperature If you still need help call our Service Department at 800 695 4500 USA and Canada only or 502 ...

Страница 22: ...for 4 Pole E230V models E531 076 32 Transformer 120 208 240 100W A554 137 33 Valve Brew 24VAC PB A537 184 34 Valve Bypass 24VAC PB A537 183 35 Solenoid Basket Lock 24vdc A554 135 36 Touchpad PB Series A530 057 37 Board AC DC Rectifier A530 058 38 Spray Elbow A518 046 39 Tee Barbed 3 8 A61152 40 Hose Overflow A585 016 41 Hose Silicone A512012 42 Elbow Silicone A548 129 Reference Tank Lid Picture 50...

Страница 23: ...Shuttle Brewers Airpot Shuttle Brewers Page 23 Front View refer to key on page 22 5 5 2 1 7 3 4 6 Lower Warmer refer to key on page 22 PB 430 pictured 23 23 22 21 20 21 22 ...

Страница 24: ...Page 24 Shuttle Brewers Airpot Shuttle Brewers Top View refer to key on page 22 42 30 34 37 38 35 36 Tank Lid refer to key on page 22 3 Heater Model shown 50 52 51 50 36 35 32 ...

Страница 25: ...aining Clip A548 142 6 Lid Stopper w O Ring A548 140 A61365 S S Cover used until August 2001 5 6 4 3 2 1 Shuttle for PB 330 and PB 430 only A537 055 Handle A522132 Bonnet Nut A522120 Spring A537 047 Plastic Stem A522102 Silicone Seat Cup Upper Faucet Part A537 049 Gauge Assembly Part A718 018 A318 119P Top Gage Fitting A522026 Washer Upper Gage A555 001 Gage Shield A522031 Gage Glass A522027 Washe...

Страница 26: ... 1 6 Self Tapping Screw 5 A539 217 4 7 Rubber Foot A548 161 4 8 Plastic Insert A548 162 3 9 Self Tapping Scres 75 A539 218 3 ITEM NO Title PART NUMBER VS S QTY 1 Stand Body A548 157 1 2 Tray for Stand A548 159 1 3 Stand Base A548 158 1 4 Tray Top A517 018 1 5 Stand Top Plate A517 019 1 6 NUT M4 W Nylon Insert A540 237 4 7 Self Tapping Screw 5 A539 217 4 8 Rubber Foot A548 161 4 Cleaning Sanitizing...

Страница 27: ...assembly a Remove unit from the base only when using VS S with VS 1 5 b Completely fill the unit with cleaning solution Using a clean cloth wipe the unit thoroughly c Rinse unit thoroughly with fresh water d Remove faucet shank and sight gauge from unit and place in cleaning solution e Open lid on the bottom of the unit and remove silicon tube Tank to Faucet Tube and place in cleaning solution for...

Страница 28: ...Page 28 Shuttle Brewers Airpot Shuttle Brewers Wiring Diagram Precision Brew 430 Series Models PB 430 PBVSA 430 and PBIC 430 ...

Страница 29: ...Shuttle Brewers Airpot Shuttle Brewers Page 29 Wiring Diagram Precision Brew 330 Series Models PB 330 PBVSA 330 and PBIC 330 ...

Страница 30: ...Page 30 Shuttle Brewers Airpot Shuttle Brewers Wiring Diagram PB 430E 230V PBVSA 430E230V PBIC 430E 230V Single or Three Phase Models ...

Страница 31: ...Shuttle Brewers Airpot Shuttle Brewers Page 31 Wiring Diagram PB 330E 230V PBVSA 330E 230V PBIC 330E 230V Brewers ...

Страница 32: ...Page 32 Shuttle Brewers Airpot Shuttle Brewers Wiring Diagram Heater Configuration 3 Heater ...

Страница 33: ...Shuttle Brewers Airpot Shuttle Brewers Page 33 Wiring Diagram Heater Configuration 1 Heater ...

Страница 34: ...Page 34 Shuttle Brewers Airpot Shuttle Brewers ...

Страница 35: ...Shuttle Brewers Airpot Shuttle Brewers Page 35 ...

Страница 36: ...o Cold and Frozen Beverage Dispensers American Metal Ware Coffee and Tea Systems Tel 502 425 4776 Fax 502 425 4664 1 800 695 4500 USA Canada only P O Box 35020 Louisville KY 40232 USA www grindmaster com email info grindmaster com Grindmaster Corporation 2003 PRINTED IN USA 0206 Form AM 344 03 Part A090 840 ...

Отзывы: