![SHOWTEC Revolution 250 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/showtec/revolution-250/revolution-250_user-manual_1260719006.webp)
4
Rigging
Please follow the European and national guidelines concerning rigging, trussing and all other safety issues.
Do not attempt the installation yourself !
Always let the installation be carried out by an authorized dealer !
Procedure:
•
If the projector is lowered from the ceiling or high joists, professional trussing systems have to be
used.
•
Use a clamp to mount the projector, with the mounting-bracket, to the trussing system.
•
The projector must never be fixed swinging freely in the room.
•
The installation must always be secured with a safety attachment, e.g. an appropriate safety net or
safety-cable.
•
When rigging, derigging or servicing the projector, always make sure, that the area below the
installation place is blocked and staying in the area is forbidden.
The Revolution can be placed on a flat stage floor or mounted to any kind of truss by a clamp.
Содержание Revolution 250
Страница 1: ...Revolution 250 ORDERCODE 40181...
Страница 9: ...7 All sides 4 5 6 Fig 2 7 4 DMX IN 5 DMX OUT 6 DMX OUT 7 Control Panel...
Страница 12: ...10...
Страница 15: ...13...
Страница 21: ...2005 Showtec...