Trial operation
Before a trial run of the dust collector, make sure:
• that the power supply cable, earth cable, insulation and voltage have been arranged as
specified;
• that there is no air leak at duct joints or no remaining material, bolt, nut or tool left behind in
the duct, and
• that the maintenance door and the dust pan are securely closed.
With the above points confirmed, turn on the power switch and turn it off quick and observe
the motor cooling fan through the air outlet on the ceiling. If it turns clockwise, it is alright. If it
turns counter-clockwise, then turn off the power supply and change the connections of 2
cables of the 3 power supply cables.
Chapter 4 Operation
Routine operation
Operation procedures:
[1] Make sure that the front door is closed.
[2] Turn on the power switch to start operation.
End operation procedures:
[1] Turn off the power switch.
[2] Wait about 2 minutes and then shake off the deposited dust on to the
dust pan and discharge.
Since continuous operation of the dust collector would blind the filter cloth and cause the
suction power to drop, stop operating the machine and go through the shaking-off and
discharge steps.
During operation, the shaking-off and discharge procedures are disabled.
Discharge of dust should be performed at the end of the day’s operation. During this
procedure, be sure to wear protective goggles and gloves and a dustproof mask.
How shake off the dust
CFA-110
Detach and clean the filter cloth.
If equipped with an optional shake-off device, turn
its handle to shake off the dust.
CFA-215–240
While holding the collector body by hand, pull the
shaker handle about 3 times. After use, return the
handle to its original position so it may not sag.