-27-
Model M1117 (For Machines Mfd. Since 9/21)
SE
RV
IC
E
SERVICE
General
This section covers the most common service adjustments
or procedures that may need to be made during the life
of your machine.
If you require additional machine service not included
in this section, please contact Woodstock International
Technical Support at (360) 734-3482 or send e-mail to:
The gibs are responsible for the amount of play in
the upper blade. They should only be adjusted if the
foot pedal is difficult to lower or if all the other blade
adjustment have been verified as correct, and the quality
of cut is still poor.
Adjusting.Gibs
Tools.Needed.
Qty
Hex Wrench 8mm ...............................................1
Open-End Wrench 17mm.......................................1
To.adjust.gibs,.do.these.steps:
Figure.26.
Location of gib screws and jam
nuts.
x 3
1..
Loosen (3) jam nuts on each gib (see
Figure
26
).
2..
Adjust (3) gib screws on each side of shear in small,
equal increments (see
Figure
26
). Test for binding or
play after each adjustment by pushing or pulling top
of cutter bar.
— If foot pedal is difficult to lower and blades are
binding, adjust screws counterclockwise.
— If too much play of in upper blade is resulting in
poor quality of cuts, adjust screws clockwise.
3..
Tighten jam nuts to secure gib adjustments.
Содержание M1117
Страница 40: ......