9
DAILY OPERATIONAL CHECKS
IMPORTANT
The SHOCKWAVE ICE does not have to be drained after every use. It is acceptable to leave your ICE console
filled for extended periods of time, but it will still need to be set properly before its next use.
Before each use, ensure there are no missing, damaged or cracked components on or under the ICE.
Check for equipment that might have been placed under the ICE.
Before sitting in the ICE, raise the zip tie travel indicators up on the exposed shock until they rest against the upper
shock body. Setup the ICE as per instructions on page 8. Once the console is “SET”, check to see if there is a gap
between the shock body and the zip tie. If a gap exists, there is a potential for an air leak in the system which has
caused the ICE to settle since its last operation. Monitor the shock in question and follow the trouble shooting guide
on page 11 if any problems arise.
DAILY OPERATIONAL CHECKS