background image

Norland Belsoe 

Assembly 

Instructions

www.simplylogcabins.co.uk

Содержание Norland Belsoe

Страница 1: ...Norland Belsoe Assembly Instructions w w w s i m p l y l o g c a b i n s c o u k...

Страница 2: ...bearers as they are already pressure treated before delivery We also recommend that you seal the external log corner joints where the logs slot together with silicone sealant not supplied to ensure an...

Страница 3: ...centres 7 Note the DC DD DE pieces fitted to the opposite side must be drilled offset to this side to ensure the screws miss each other Fig 4 8 Place the other DC part underneath and drill through bo...

Страница 4: ...3 Screw the inner piece of the hinge to the door with 2 x 25mm screws 7 Close the hinges and lay the frame assembly over the doors fig 14 Fig 14 8 Make a visual judgement to set an even gap top bottom...

Страница 5: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 6: ...1777 2 1421 2 rubber drip bar 1600 w w w s i m p l y l o g c a b i n s c o u k...

Страница 7: ...mm 1276mm 1643mm WC 2 90X20 FRAMING 842mm 842mm 842mm WD 2 70X20 FRAMING 633mm 633mm 633mm WE 2 Draught excluder 633mm 633mm 1511mm 2 Draught excluder 776mm 1143mm 633mm 1 DRIP BAR 800mm 800mm 8000mm...

Страница 8: ...each corner is flush with 2x50mm screw fig A1 Fig A1 7 Layout parts WC WD WE WJ on top of the previous assembly as shown in the outer frame drawing Fig A2 8 Mark the first hole position 30mm from the...

Страница 9: ...NER SCREWS LOOSE SO YOU CAN REMOVE FRAME FROM THE BUILDING FOR PAINTING Fig A8 Fig A9 19 Window insert Place one hinge on the inner rebate part of the window approx One hinge width along from the reba...

Страница 10: ...g A16 28 Stand the window up so it easier to fix the pins for the casement stays Fig A17 29 Position the first pin so it fits into the first hole on the stay making sure it holds the window tight Care...

Страница 11: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 12: ...1511 2 633 2 rubber 800 drip bar w w w s i m p l y l o g c a b i n s c o u k...

Страница 13: ...7mm WC 2 90X20 FRAMING 1527mm 1527mm 1527mm WD 2 70X20 FRAMING 1318mm 1318mm 1318mm WE 2 51mm x 20 framing 1171mm 1538mm 847mm WJ 4 Draught excluder 633mm 633mm 633mm 1 DRIP BAR 1490mm 1490mm 1490mm D...

Страница 14: ...fig A2 and position the WM piece this is two pieces of wood already fixed side by side Pre drill 2 3mm holes in the WB and WT parts and fix with 2x50mm screws at each end Fig A2 8 Layout parts WC WD...

Страница 15: ...INNER SCREWS LOOSE SO YOU CAN REMOVE FRAME FROM THE BUILDING FOR PAINTING Fig A9 Fig A10 20 Window insert Place one hinge on the inner rebate part of the window approx One hinge width along from the...

Страница 16: ...2 x 25mm screws Fig A17 Fig A17 29 Stand the window up so it easier to fix the pins for the casement stays Fig A18 30 Position the first pin so it fits into the first hole on the stay making sure it h...

Страница 17: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 18: ...633 4 776 4 rubber drip bar 1490 w w w s i m p l y l o g c a b i n s c o u k...

Страница 19: ...g 70mm nails at a slight angle 10 The joist spacing is on drawing pages FIG 4 joined bearers shown may be 1 piece 4 Using parts list for each wall lay out correct quantity of each component for releva...

Страница 20: ...ur building but the same principals are used for fitting them FIG 8 example 5 Door unit must be placed into position after the first two layers of full logs have been assembled fig5 Slide unit into ap...

Страница 21: ...overhang of approximately 100mm should be allowed at the front and the back Fig 16 all felt strips and the length of the eaves edgings at the side 7 Line up the felt at the marks step 4 leaving enoug...

Страница 22: ...ture of each window 2 Hold into position with four pieces of beading The beading may need to be swapped around to get the best fit When satisfied secure into posi tion using 2x 15mm panel pins per pie...

Страница 23: ...posts veranda only and mark their position with a pencil 8 Next fix parts support posts to the centre of the V12 Fig 27 with 40mm screws Fig 27 9 Place the support posts Fig 28 29 using a spirit level...

Страница 24: ...nd Belsoe Optional W4D 44mm log FLOOR PLAN Pressure treated Floor joists 34x62 15 x 4280 OR 30X2140 13 JOINERS Joists may be joined Floor boards 38 x 4710 Pressure treated Fig 3 Detail showing floorbo...

Страница 25: ...s 2xC 15xD 357 357 357 357 357 357 357 357 357 357 357 357 4990 x 4490 5990 Norland Belsoe Optional W4D 44mm log FRONT Parts list A1 x 1 A2 x 1 C x 4 D x 30 E x 30 page 2 bearer spacing Front view w w...

Страница 26: ...57 357 357 357 357 357 357 357 357 357 4990 x 4490 5990 Norland Belsoe Optional W4D 44mm log BACK Parts list A x 18 A1 x 1 4407 2842 1277 TOP Notch double cut out page 3 Back View w w w s i m p l y l...

Страница 27: ...298 298 297 298 4990 x 4490 5990 Norland Belsoe Optional W4D 44mm log LH SIDE Parts list B x9 B1 x 1 F x12 I1 x 1 J x 1 K x 1 L x 1 M x 1 per side Verandah V1x3 V1t x1 V2x3 V3x3 Capping V13 joiner X2...

Страница 28: ...298 298 297 298 4990 x 4490 5990 Norland Belsoe Optional W4D 44mm log RH SIDE Parts list B x9 B1 x 1 F x12 I1 x 1 J x 1 K x 1 L x 1 M x 1 per side Verandah V1x3 V1t x1 V2x3 V3x3 Capping V13 joiner X2...

Страница 29: ...v 6 v4 v4 v4 v4 v4 v4 V12 V11 V12 1260 715 V13 V14 695 255 V12 V11 V11 V12 V12 V15 V16 V15 V16 V16 V15 2958 1450 All V6 except top ones V5B V5B V5B 4990 VERANDAH PARTS LIST V4 X 12 V5 X 4 V5B X 2 V5T...

Страница 30: ...5990 Norland Belsoe Optional W4D 44mm log ROOF ASSY Parts list 8 Roof bearers 2 Angled eaves edging strips 2 Angled roof edgings 110 Roof boards 2630 long page 7 Roof w w w s i m p l y l o g c a b i...

Отзывы: