42(56)
3.6
Installation of Regrind Storage Bin, Screen and Screen Bracket
1) Put the screen into the screen bracket and screw the screen down with 2
screws.
2) Lift up the screen bracket and make its iron rod slide along with both
sideboards into the fixing grooves.
3) Lift up the screen bracket again and lock it closely with the very front fixing
pothook.
4) Put the storage bin underside of the grinding room.
5) Fixed the safely switch.
Picture 3-10
:
Installation of Regrind Storage Bin, Screen and Screen Bracket
3.7 Installation of Screen, Screen Frame and Storage Bin
1) Hoist the feed box to put it on the cutting chamber carefully to match.
2) Mount both side location pin and lockup with lockup screw.
Picture 3-11
:
Installation of Screen, Screen Frame and Storage Bin 1
3) Lockup the two pothooks in the front of the feed box.
Содержание SG-3650E
Страница 1: ...SG 36E Standard Central Granulators Date Apr 2013 Version Ver A English...
Страница 2: ......
Страница 8: ...8 56...
Страница 28: ...28 56 2 4 Wiring Diagram 2 4 1 Main Circuit Picture 2 13 Main Circuit...
Страница 29: ...29 56 2 4 2 Control Circuit Picture 2 14 Control Circuit 1...
Страница 30: ...30 56 Picture 2 15 Control Circuit 2...
Страница 31: ...31 56 2 4 3 Electrical Components Layout Picture 2 16 Electrical Components Layout...