37(56)
3.1 Installation Notice
1) Make sure voltage and frequency of the power source comply with those
indicated on the manufacture's plate, which is attached to the machine.
2) Power cable and earth connections should conform with local regulations.
3) Use independent power cable and ON / OFF switch. The cable's dia. Should
not smaller than those applied in the control box.
4) The power cable connection terminals should be tightened securely.
5) The machine requires a 3-phase 4-wire power source, connect the power
lead (L1, L2, L3) to the live wires, and the earth (PE) to the ground.
6) Power supply requirements:
Main power voltage: +/- 10%
Main power frequency: +/- 2%
Make at least 1 meter clearance around the machine to facilitate repair and
maintenace.
Picture 3-1
:
Installation Space
Chart 3-1
:
Attached Form, Cutters and Other Fixing Screw Torque
Thread size
M10
M12
M14
M16
M18
M20
M22
M24
Axial force(N)
23.8
34.5
47
65.5
78.5
103
129
149
Fixing torque (Nm)
50
86
135
215
290
420
570
730
Содержание SG-3650E
Страница 1: ...SG 36E Standard Central Granulators Date Apr 2013 Version Ver A English...
Страница 2: ......
Страница 8: ...8 56...
Страница 28: ...28 56 2 4 Wiring Diagram 2 4 1 Main Circuit Picture 2 13 Main Circuit...
Страница 29: ...29 56 2 4 2 Control Circuit Picture 2 14 Control Circuit 1...
Страница 30: ...30 56 Picture 2 15 Control Circuit 2...
Страница 31: ...31 56 2 4 3 Electrical Components Layout Picture 2 16 Electrical Components Layout...