○
CONTENTS
⚫
For safe operation
-------------------------------------------
1
1. Matters to be attended to for safety
1. Warning label locations
----------------------------------
2
2. Caution marks
--------------------------------------------
3
2. Name of components
----------------------------------------
7
3. Handling of pump
(Before starting operation)
---------------------------------
9
(Operating method)
----------------------------------------
13
(Discharging with multiple pumps)
------------------------
19
(Suction and discharge of water from Fire hydrant)
------
20
(Operation in cold districts in winter)
---------------------
22
4. Periodical inspections
1. Periodical inspection schedule
--------------------------
23
2. Inspection method
--------------------------------------
24
5. Troubleshooting
---------------------------------------------
29
6. Specifications
------------------------------------------------
34
7. Wiring diagram
----------------------------------------------
36
Содержание TF516MH-AB
Страница 9: ...7 2 Name of components Recoil starter side Operating side...
Страница 10: ...8 2 Name of components Pump side Non operation side...
Страница 38: ...36 7 Wiring diagram...
Страница 39: ......
Страница 40: ...K20000120 0 2018 9 Printed in Japan...