
25
Installation
o
utSiDe
v
eRticaL
i
nStaLLationS
- f
ReeStanDing
:
To accomplish a outside vertical pipe installation, follow steps 1 through 5 in the “
i
nside
v
ertical
i
nstallatiOns
- F
reestanding
”
section and then finish it by performing the following (refer to Figure 33).
1. Install a tee with clean out on the outside of the house.
2. Install PL vent upward from the tee. Make sure that you install support brackets to keep the vent
straight and secure.
3. Install ceiling thimble and secure the flashing as you go through the roof.
4. Ensure that the rain cap is approximately 24” (610 mm) above the roof.
Rain cap
Flashing
24"
(61 cm)
3"
(7.5cm)
Tee with
cleanout
Fresh air
intake
3" (7.5 cm)
Clearance
Support
bracket
Type "L"
vent
Figure 33: Outside Vertical Installation.
Содержание GF55
Страница 29: ...29 of 194 29 of 194...
Страница 30: ...30 of 194 30 of 194...
Страница 31: ...31 of 194 31 of 194...
Страница 32: ...32 of 194 32 of 194...
Страница 33: ...33 of 194 33 of 194...
Страница 38: ...38 of 194 38 of 194...
Страница 39: ...39 of 194 39 of 194...
Страница 40: ...40 of 194 40 of 194...
Страница 41: ...41 of 194 41 of 194...
Страница 42: ...42 of 194 42 of 194...
Страница 45: ...1 19 2018 45 of 194 45 of 194...
Страница 48: ...1 19 2018 48 of 194 48 of 194...
Страница 49: ...49 of 194 49 of 194...
Страница 50: ...50 of 194 50 of 194...
Страница 52: ...52 of 194 52 of 194...
Страница 53: ...53 of 194 53 of 194...
Страница 114: ...43 MERIDIAN Components May 2015 4 11 1 17 6 2 12 7 5 3 39 Parts Diagram Components...
Страница 116: ...45 MERIDIAN Insert Steel Parts May 2011 48 50 49 52 53 51 46 47 37 36 34 45 33 32 35 40a Parts Diagram Insert Steel...
Страница 117: ...46 Notes...
Страница 155: ...36 MERIDIAN CAST IRON Components May 2015 4 11 1 10 6 2 9 7 5 3 8 Parts Diagram Components...
Страница 157: ...38 Notes...