Sherwood GF55 Скачать руководство пользователя страница 62

OMNI-Test Laboratories, Inc.

V

m(std)

 – Volume of Gas Sampled Corrected to Dry Standard Conditions, dscf

ASTM E2515 equation (6)

Where:

K

1

=

17.64 

°

R/in. Hg

V

m

=

Volume of gas sample measured at the dry gas meter, dcf

Y

=

Dry gas meter calibration factor, dimensionless

P

bar

=

Barometric pressure at the testing site, in. Hg

 

H

=

Average pressure differential across the orifice meter, in. H

2

O

T

m

=

Absolute average dry gas meter temperature, 

°

R

Sample Calculation:

Using equation for Train 1:

1.33

V

m(std)

 = 

17.64

x 59.517 x

0.981

x

13.6

(

81.9

+

460

)

V

m(std)

 =

57.023

dscf

Using equation for Train 2:

1.12

V

m(std)

 = 

17.64

x 59.234 x

0.984

x

13.6

(

81.6

+

460

)

V

m(std)

 =

56.925

dscf

Using equation for ambient train:

0.00

V

m(std)

 = 

17.64

x

0.00

x

0

x

13.6

(

70.9 +

460

)

V

m(std)

 =

0.000

dscf

)

+

29.9 +

)

(

29.9

29.9 +

(

(

)

m

bar

m

std

m

T

H

P

Y

V

K

V

 

+

=

6

.

13

1

)

(

Control No. P-SFDK-0002,  Effective date:  5/06/2016

File - Run 1, Tab - Example Calculations

62 of 194

62 of 194

Содержание GF55

Страница 1: ...nd OR 97230 503 643 3788 Test Period January 11 2018 Report Date September 13 2018 Report Number 0268PM025E All data and information contained in this report are confidential and proprietary to Sherwo...

Страница 2: ...MNI Test Laboratories Inc AUTHORIZED SIGNATORIES This report has been reviewed and approved by the following authorized signatories Evaluator ___________________________ Aaron Kravitz OMNI Test Labora...

Страница 3: ...mary Tables 9 Table 1 Particulate Emissions 9 Table 2 Efficiency and CO 9 Table 3 Test Facility Conditions 10 Table 4 Fuel Measurement Summary 10 Table 5 Dilution Tunnel and Flue Gas Measurements 11 T...

Страница 4: ...dian 1 Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc Section 1 Appliance Testing Results 1 1 Appliance Description 1 2 Procedures and Results Summary 1...

Страница 5: ...electrical fuel feed combustion air and convection air supply systems The frame of the unit is constructed of mild steel as is the outer fascia and door Combustion products are routed out of the fireb...

Страница 6: ...n FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc Appliance Photographs Meridian Series Test Date 1 11 2018 Meridian Series Front Meridian Series Back Meridian Se...

Страница 7: ...representative Aaron Kravitz conducted the certification testing and completed all testing by January 11 2018 This report is organized in accordance with the EPA recommended outline and is summarized...

Страница 8: ...facturer s instructions adjusting an air inlet slide to achieve a static pressure of 0 13 inches of water after 30 minutes at maximum burn rate This slide was fixed in place throughout the integrated...

Страница 9: ...0 81 0 89 Emission Factor g dry kg 0 46 1 01 Table 2 Efficiency and CO Burn Rate Segment Integrated Total Maximum Medium Minimum Time minutes 61 120 180 361 Burn Rate dry kg hr 1 75 0 85 0 62 0 89 Hea...

Страница 10: ...dle Final Room Temperature F 72 71 70 Barometric Pressure in Hg 29 92 29 90 29 89 Air Velocity ft min 50 50 50 Induced Draft in H2O 0 0 0 Table 4 Fuel Measurement Summary Pretest Burn Rate Segment Int...

Страница 11: ...d Flue Gas Measurements Burn Rate Segment Integrated Total Maximum Medium Minimum Flue Draft in H2O 0 057 0 045 0 038 0 044 Tunnel Velocity ft sec 13 06 12 86 12 73 12 83 Tunnel Flow Rate dscf min 141...

Страница 12: ...ustries Ltd Models Meridian 1 Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc Section 2 Test Data 2 1 Test Data by Run 2 2 Sample Analysis Tares 12 of 19...

Страница 13: ...Sherwood Industries Ltd Models Meridian 1 Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc 2 1 Test Data by Run Run 1 Notes Results 13 of 194 13 of 194...

Страница 14: ...0 0 01 0 09 0 00 30 30 51 9 0 6 273 70 0 01 0 09 0 00 31 31 51 9 0 303 70 0 03 0 09 0 00 32 32 51 8 0 1 430 70 0 03 0 09 0 00 33 33 51 9 0 1 427 70 0 02 0 09 0 00 34 34 51 8 0 1 410 70 0 02 0 09 0 00...

Страница 15: ...0 429 72 0 03 6 29 0 01 84 84 47 5 0 1 429 72 0 00 4 65 0 00 85 85 47 4 0 1 415 72 0 01 0 07 0 00 86 86 47 4 0 417 72 0 03 0 42 0 00 87 87 47 3 0 1 428 72 0 03 5 13 0 01 88 88 47 2 0 1 434 72 0 03 1 1...

Страница 16: ...03 11 7 0 432 75 75 72 0 058 6 79 0 01 15 2 462 2 477 0 16 0 16 1 34 76 2 04 1 15 76 1 2 114 0 048 0 219 13 07 102 103 11 6 0 1 430 76 75 72 0 057 5 63 0 01 16 2 626 2 641 0 16 0 16 1 34 77 2 04 1 14...

Страница 17: ...72 0 058 6 88 0 02 53 8 664 8 656 0 16 0 16 1 29 81 2 15 1 08 81 1 4 113 0 048 0 219 13 06 100 100 9 0 0 1 434 77 77 72 0 057 6 74 0 02 54 8 826 8 817 0 16 0 16 1 29 81 2 15 1 08 81 1 4 113 0 048 0 2...

Страница 18: ...0 01 93 15 279 15 128 0 17 0 17 1 35 83 2 02 1 14 83 1 5 96 0 048 0 219 12 86 101 101 7 4 0 303 76 75 71 0 045 3 62 0 01 94 15 446 15 293 0 17 0 16 1 35 83 2 02 1 14 83 1 5 96 0 048 0 219 12 86 101 10...

Страница 19: ...44 2 81 0 01 133 21 922 21 721 0 17 0 16 1 35 82 2 04 1 13 82 1 6 94 0 048 0 219 12 84 101 101 6 0 0 1 298 74 74 70 0 046 3 83 0 01 134 22 088 21 886 0 17 0 16 1 34 82 2 04 1 13 82 1 6 94 0 048 0 219...

Страница 20: ...297 74 73 70 0 045 2 73 0 01 173 28 556 28 314 0 17 0 17 1 35 82 2 09 1 14 82 1 6 95 0 048 0 219 12 85 101 101 4 7 0 300 74 73 70 0 045 3 43 0 174 28 721 28 479 0 16 0 16 1 35 82 2 08 1 14 82 1 6 95...

Страница 21: ...037 2 73 0 02 213 35 165 34 893 0 16 0 16 1 33 82 2 14 1 12 82 1 7 87 0 048 0 219 12 76 99 99 3 6 0 1 236 73 72 71 0 037 3 32 0 01 214 35 330 35 056 0 16 0 16 1 32 82 2 13 1 12 82 1 7 87 0 048 0 219 1...

Страница 22: ...0 036 3 15 0 02 253 41 790 41 510 0 17 0 17 1 35 83 2 28 1 15 82 1 8 90 0 048 0 219 12 79 100 101 2 6 0 1 235 73 73 71 0 037 3 24 0 01 254 41 956 41 677 0 17 0 17 1 35 83 2 28 1 15 82 1 8 90 0 048 0...

Страница 23: ...12 73 98 99 1 7 0 241 73 73 71 0 038 3 58 0 03 293 48 398 48 115 0 16 0 16 1 31 83 2 36 1 11 83 1 9 85 0 048 0 219 12 73 98 99 1 6 0 1 240 73 73 71 0 038 3 22 0 02 294 48 563 48 279 0 16 0 16 1 32 84...

Страница 24: ...0 0 039 2 95 0 02 333 54 932 54 630 0 16 0 16 1 29 83 2 44 1 09 82 2 81 0 048 0 219 12 69 98 97 0 7 0 235 72 72 70 0 039 2 87 0 02 334 55 094 54 792 0 16 0 16 1 28 83 2 45 1 09 82 2 81 0 048 0 219 12...

Страница 25: ...ment Numbers Temp 113 113 113 113 113 113 113 113 113 F Vstrav 13 05 ft sec Vscent 15 13 ft sec Fp 0 863 Particulate Sampling Data Elapsed Time min Gas Meter 1 ft3 Gas Meter 2 ft3 Sample Rate 1 cfm Sa...

Страница 26: ...Pellet Heater Run Notes Air Control Settings High Burn Rate Target 100 Settings Temperature 5 Medium Burn Rate Target 50 Settings Temperature 2 Low Burn Rate Target Minimum Settings Temperature 1 Pre...

Страница 27: ...ppm 901 Pre Test Post Test Zero Span Zero Span Time 9 40 9 42 16 06 16 09 CO2 0 00 9 97 0 02 9 95 CO 0 000 2 502 0 000 2 527 CO ppm 0 901 0 912 Air Velocity ft min Initial 50 Final 50 Scale Audit lbs...

Страница 28: ...Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc 2 2 Sample Analysis Tares Analysis Worksheets Tared Filter Probe and O Ring Data Pellet Fuel Label Pellet...

Страница 29: ...29 of 194 29 of 194...

Страница 30: ...30 of 194 30 of 194...

Страница 31: ...31 of 194 31 of 194...

Страница 32: ...32 of 194 32 of 194...

Страница 33: ...33 of 194 33 of 194...

Страница 34: ...SO 1928 GJ tonne 19 08 17 65 Net Cal Value at Const Pressure ISO 1928 J g 19079 17655 Gross Cal Value at Const Vol ASTM E711 J g 20398 19048 Gross Cal Value at Const Vol ASTM E711 Btu lb 8770 8190 Car...

Страница 35: ...1 Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc Section 3 Laboratory Quality Assurance 3 1 Quality Assurance Quality Control 3 2 Calibration Data 3 3 E...

Страница 36: ...nated TL 130 To perform product safety testing as a Certification Organization by the Standards Council of Canada SCC Serving as a testing laboratory for the certification of wood heaters by the U S E...

Страница 37: ...r Barometer Princo Equipment Record 283A Audit Weights Troemner 21pc Msas Set Calibration Certificate 335 Sample Box Dry Gas Meter Apex Automated Emissions Sampling Box Calibration Log 336 Sample Box...

Страница 38: ...38 of 194 38 of 194...

Страница 39: ...39 of 194 39 of 194...

Страница 40: ...40 of 194 40 of 194...

Страница 41: ...41 of 194 41 of 194...

Страница 42: ...42 of 194 42 of 194...

Страница 43: ...n Parameters Run 1 Run 2 Run 3 Reference Meter Pressure H2O Pr 0 00 0 00 0 00 DGM Pressure H2O Pd 2 30 1 38 1 00 Initial Reference Meter 198 1 203 7 214 2 Final Reference Meter 203 602 208 8 222 5 Ini...

Страница 44: ...SPC Acceptable tolerance is 4 The uncertainty of measurement is 0 4 WC This is based on the reference standard having a TAR Test Accuracy Ratio of at least 4 1 Technician signature Date 1 18 2018 Rev...

Страница 45: ...1 19 2018 45 of 194 45 of 194...

Страница 46: ...Parameters Run 1 Run 2 Run 3 Reference Meter Pressure H2O Pr 0 00 0 00 0 00 DGM Pressure H2O Pd 1 95 1 20 0 80 Initial Reference Meter 223 4 231 9 238 Final Reference Meter 231 7 237 9 243 503 Initial...

Страница 47: ...C SPC Acceptable tolerance is 4 The uncertainty of measurement is 0 4 WC This is based on the reference standard having a TAR Test Accuracy Ratio of at least 4 1 Technician signature Date 1 18 2018 Re...

Страница 48: ...1 19 2018 48 of 194 48 of 194...

Страница 49: ...49 of 194 49 of 194...

Страница 50: ...50 of 194 50 of 194...

Страница 51: ...Calibrate Prior to use OMNI in house CAI ZRE 4 Gas Analyzer OMNI 00594 CO2 O2 and dual range CO gas analyzer ZRE 4 Check X for answer 1 Complete Calibration documentation 2 Complete top half of this f...

Страница 52: ...52 of 194 52 of 194...

Страница 53: ...53 of 194 53 of 194...

Страница 54: ...Sherwood Industries Ltd Models Meridian 1 Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc 3 3 Example Calculations 54 of 194 54 of 194...

Страница 55: ...tunnel gas velocity ft sec Cs Concentration of particulate matter in tunnel gas dry basis corrected to standard conditions g dscf Particulate concentration g dscf ET Total Particulate Emissions g Dil...

Страница 56: ...MSwb weight of test fuel in hopper at start of test run wet basis kg MEwb weight of test fuel in hopper at end of test run wet basis kg Sample Calculation 6 6 MSwb 12 6 lbs MEwb 0 0 lbs 0 4536 Conver...

Страница 57: ...t of test run segment i wet basis kg MESiwb weight of test fuel in hopper at end of test run segment i wet basis kg Sample Calculation from medium burn rate segment FM 6 6 MSSiwb 8 4 lbs MESiwb 4 4 lb...

Страница 58: ...est run kg hr ASTM E2779 equation 3 60 MBdb Where Total length of full intergrated test run min Sample Calculation MBdb 5 36 kg 361 min 60 x 5 36 BR 0 89 BR 361 kg hr BR Control No P SFDK 0002 Effecti...

Страница 59: ...E2779 equation 4 60 MBSidb Si Where Si Total length of test run segment i min Sample Calculation from medium burn rate segment MBSidb 1 70 kg 120 min 60 x 1 7 BR 0 85 BR 120 kg hr BRSi Control No P SF...

Страница 60: ...H20 in Hg in H20 13 6 Ms The dilution tunnel wet molecular weight Ms 28 78 assuming a dry weight of 29 lb lb mole Sample calculation 13 05 15 13 93 6 1 2 Vs 0 863 x 85 49 x 0 99 x 0 219 x 0 18 13 6 V...

Страница 61: ...ft2 Tstd Standard absolute temperature 528 R Ps Absolute average gas static pressure in diltuion tunnel Pbar Pg in Hg Ts Absolute average gas temperature in the dilution tunnel R R F 460 Pstd Standar...

Страница 62: ...s the orifice meter in H2O Tm Absolute average dry gas meter temperature R Sample Calculation Using equation for Train 1 1 33 Vm std 17 64 x 59 517 x 0 981 x 13 6 81 9 460 Vm std 57 023 dscf Using equ...

Страница 63: ...mass of particulate matter from filter seals mg Sample Calculation Using equation for Train 1 first hour mn 0 0 0 9 0 0 mn 0 9 mg Using equation for Train 1 remainder mn 0 0 3 7 1 2 mn 4 9 mg Train 1...

Страница 64: ...tter collected in the sampling train mg Vm std Volume of gas sampled corrected to dry standard conditions dscf Sample calculation For Train 1 5 8 57 02 Cs 0 00010 g dscf For Train 2 6 0 56 93 Cs 0 000...

Страница 65: ...of test run minutes Sample calculation For Train 1 ET 0 000102 0 000000 x 8469 6 x 361 60 ET 5 18 g For Train 2 ET 0 000105 0 000000 x 8469 6 x 361 60 ET 5 37 g Average E 5 28 g Total emission values...

Страница 66: ...on tunnel ft sec Tmi Absolute average dry gas meter temperature during the ith time interval o R Tm Absolute average dry gas meter temperature o R Tsi Absolute average gas temperature in the dilution...

Страница 67: ...79 equation 5 PMR 60 ET Where ET Tota particulate emissions grams Total length of full intergrated test run min Sample Calculation ET Dual train average 5 28 g 361 min PMR 60 x 5 28 361 PMR 0 88 g hr...

Страница 68: ...E2779 equation 6 PMF ET MBdb Where ET Tota particulate emissions grams MBdb Weight of test fuel burned during test run dry basis kg Sample Calculation ET Dual train average 5 28 g MBdb 5 36 kg PMF 5 2...

Страница 69: ...Sherwood Industries Ltd Models Meridian 1 Meridian FPI Meridian Cast Iron GF55 GFI55 Report Number 0261PF026E OMNI Test Laboratories Inc Appendix A Labeling Owner s Manual...

Страница 70: ...ble materials Les d gagements minimums aux mat riels combustibles A Sidewall to Unit Du mur de c t l appareil 6 152 mm B Backwall to Unit Du mur de derri re l appareil 3 76 mm C Corner to Unit Du coin...

Страница 71: ...d gagements minimums aux mat riels combustibles A Sidewall to Unit Du mur de c t l appareil 6 152 mm B Backwall to Unit Du mur de derri re l appareil 3 76 mm C Corner to Unit Du coin l appareil 2 51...

Страница 72: ...THIS MANUAL FOR FUTURE REFERENCE Version fran aise www enviro com fr PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS PELLET BURNING ROOM HEATER FAILURE TO FOLLOW THESE INSTRUCTIONS...

Страница 73: ...0 Outside Fresh Air Connection 20 Corner Through Wall Installation Freestanding 21 Horizontal Exhaust Through Wall Installation Freestanding 21 Vertical Rise with Horizontal Termination Installation R...

Страница 74: ...ider damper located on the left side of the stove When installing the stove in a mobile home it must be electrically grounded to the steel chassis of the home and bolted to the floor Make sure that th...

Страница 75: ...KE DETECTOR Smoke detectors should be installed and maintained in the structure when installing and operating a pellet burning appliance OPERATION The ash pan and door must be closed securely for prop...

Страница 76: ...e Content 8 maximum Heat Content approximately 8200 Btu per pound minimum ASH The ash content of the fuel and operation of your stove will directly determine the frequency of cleaning The use of high...

Страница 77: ...tes ranging from 8 894 23 765 Btu hr Efficiency 69 7 HHV WARNING This pellet heater needs periodic inspection and repair for proper operation It is against federal regulations to operate this pellet h...

Страница 78: ...the one that shows the current setting the default setting is the number 2 light To adjust the setting hold the Combustion Blower Trim button down and press the Heat Level up or down buttons to adjus...

Страница 79: ...L AUGER C 11625 MODE 1 2 3 4 5 6 8 7 9 return to the previous MANUAL setting If the thermostat contacts remain open the stove automatically begins its shutdown routine The ON OFF button can be presses...

Страница 80: ...ure 5 Slider Damper Knob slider push in slightly If the flame is in the middle of these two characteristics with a bright yellow orange active flame with no black tips then the air is set for proper o...

Страница 81: ...ed one setting at a time until the problem improves Factory Setting is 2 3 If the fire is going out on low because the airflow is too great the Combustion Blower Trim can be lowered to the 1 setting 4...

Страница 82: ...ause the auger to jam and may result in pellets burning in the drop tube and hopper Using a metal scrapper remove material that has accumulated or is clogging the liner s holes Then dispose of the scr...

Страница 83: ...H PAN weekly The ash pan is located under the burner Dump the ashes into a metal container stored away from combustibles Monitor the ash level every week Remember that different pellet fuels will have...

Страница 84: ...on It is very important that the stove be cleaned and serviced as stated above CLEANING PLATED SURFACES Painted surfaces should be wiped with a damp cloth periodically It is important to note that fin...

Страница 85: ...15 cm diameter or over 28 inches 180 cm cross sectional area An interior vent can be used with approved pipe passing through the ceiling and roof 5 Locate the stove in a large and open room that is ce...

Страница 86: ...32mm 24 3 4 629mm Installation Dimensions Freestanding Figure 13 Meridian Freestanding Dimensions 23 3 4 604mm 12 7 8 326mm 22 7 8 583mm 23 7 8 605mm Figure 14 Meridian Fireplace Insert Dimensions Dim...

Страница 87: ...idian on Floor Protection Minimum Width 36 914mm Minimum Height 48 1219mm Maximum Depth 30 762mm Back wall Side wall Adjacent wall 2 51mm 3 76mm 6 152mm Installation Clearances to Combustibles Freesta...

Страница 88: ...four T 20 screws see Figure 20 The back height of this unit can be set to one 1 of three 3 heights 19 483 mm 21 537 mm 22 565 mm The hopper should be set to the maximum height that can be used in the...

Страница 89: ...Ensure the unit is electrically grounded to the chassis of your home permanently WARNING Do not install in a room people sleep in CAUTION The structural integrity of the manufactured home floor wall...

Страница 90: ...ermination locations Table 1 Use in conjunction with Figure 13 for allowable exterior vent termination locations Air Supply Inlet Gas Meter Restriction Zone Termination not allowed Termination Cap G G...

Страница 91: ...9 1 16 229mm Outside fresh air is mandatory when installing this unit in airtight homes and mobile homes A Fresh air intake is strongly recommended for all installations Failure to install intake air...

Страница 92: ...framing plumbing wiring etc 2 Install a non combustible hearth pad where necessary 3 Place the appliance 15 37 5 cm away from the wall If the stove is to be set on a hearth pad set the unit on it 4 L...

Страница 93: ...ght through wall Installation 10 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the outside of the home to connect to the first sect...

Страница 94: ...with a rodent screen may be used in place of the termination cap or stainless steel termination hood Through Concrete Wall With Vertical Rise Installations Freestanding A 45 elbow with a rodent scree...

Страница 95: ...on a carpeted surface and space the unit in a manner so when the pellet vent is installed vertically it will be 3 76 mm away from a combustible wall 3 Locate the center of the fresh air intake pipe on...

Страница 96: ...a tee with clean out on the outside of the house 2 Install PL vent upward from the tee Make sure that you install support brackets to keep the vent straight and secure 3 Install ceiling thimble and se...

Страница 97: ...ireplace dampers 3 Connect a clean out tee or a 90 elbow to the exhaust pipe 4 Install flexible stainless steel liner or listed pellet vent to the top of the chimney Floor Protection Combustible Floor...

Страница 98: ...r the gasketed opening in the stove where the exhaust motor was removed from 4 Install the exhaust blower motor in the Exterior Vent Housing Box onto the exhaust blower housing 5 Follow the procedures...

Страница 99: ...and a small bead of high temperature silicone at each chimney connection Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in a...

Страница 100: ...ation Outside Vertical Installations Freestanding Ensure that vent pipe is properly secured to wall using wall straps Maintain clearances to combustibles on vent pipe as well as unit Rain Cap Roof she...

Страница 101: ...OT cut or modify any factory firebox parts If the fireplace insert does not fit into a zero clearance fireplace we recommend you use an ENVIRO freestanding model and install as a hearth mounted unit I...

Страница 102: ...tion Combustible Floor Masonry Fireplace Min 6 15 2 cm 8 203mm Mantle Minimum 8 203mm from body of the heater Chimney must be completely sealed with a non combustible material and maybe removed annual...

Страница 103: ...see Figure 42 REMOVAL When maintenance is required on the unit the surround must be removed Pull the surround straight up till it stops then pull it out about 4 10 cm and rest the surround on top of...

Страница 104: ...to Figure 45 Close both cab sides and replace the two 2 screws on each side REMOVAL OF TOP TRIM With door open undo the two 2 screws on the underside of the top there are visible under the angled cor...

Страница 105: ...Manual Figure 48 Inner side of Meridian door Plated Door Installation TO AVOID PERSONAL INJURY DO NOT REMOVE OR REPLACE COVER WHEN PELLET STOVE IS HOT Door must be open The three 3 arrows in Figure 4...

Страница 106: ...nit has been placed in the HI LOW mode the unit will be taken to a low or idle setting when the thermostat is not calling for heat When the thermostat calls for heat the unit will go to the setting th...

Страница 107: ...ced in the burn pot Check the Heat Level Indicator If the 2 light is flashing see the 2 light is flashing Check the fuse on the circuit board If the unit still does not start contact your local servic...

Страница 108: ...is installed Check the operation by opening a window does this solve the problem If it does install fresh air intake to unit or room Venting system may require vertical section to move termination int...

Страница 109: ...gnitor should be bright orange in color If not replace the ignitor 9 Control settings Heat Level has no effect on the fire NOTE If the system light is flashing the Control Board has complete control o...

Страница 110: ...Yellow Yellow Grey Grey Grey Grey Purple Purple Blue 115V Black 220V Brown Black Black Black Blue Black Armor Cable Supplied Vacuum Switch Combustion Blower Optional Exterior Exhaust Blower Power Cor...

Страница 111: ...omplete EF 028 9 Slider Damper Rod with Knob EF 050 10 Glass Set with Tape EF 062 11 Slider Damper Plate EF 064 12 Brass Auger Bushing EF 065 13 Ash Pan Latch Freestanding EF 178 Pedestal Ash Pan Gask...

Страница 112: ...Back Grill Freestanding 50 675 27 Hopper Lid Freestanding 50 676 28 Top Front Freestanding 50 677 29 Tube Cleaner Rod 50 680 30 Fluted Liner Set 50 3038 31 Liner Retainer Set 50 682 Owner s Manual 11...

Страница 113: ...50 664 43 Lower Cabinet Trim 1 piece Antique Copper Freestanding 50 665 44 Upper Cabinet Trim 1 piece Painted Freestanding 50 666 44 Upper Cabinet Trim 1 piece Gold Freestanding 50 667 44 Upper Cabin...

Страница 114: ...43 MERIDIAN Components May 2015 4 11 1 17 6 2 12 7 5 3 39 Parts Diagram Components...

Страница 115: ...44 MERIDIAN Freestanding Steel Parts May 2011 10 42 8 41 20 21 31 18 38 22 13 29 30 23 24 40b 28 14 16 19 26 27 44 43 45 25 Parts Diagram Freestanding Steel...

Страница 116: ...45 MERIDIAN Insert Steel Parts May 2011 48 50 49 52 53 51 46 47 37 36 34 45 33 32 35 40a Parts Diagram Insert Steel...

Страница 117: ...46 Notes...

Страница 118: ...als for which the unit is not certified by the EPA and void if not operated according to the Owner s Manual Exclusions An expanded list of exclusions is available at www enviro com help warranty html...

Страница 119: ...NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE ______________...

Страница 120: ...INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH CONTACT YOUR BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA INSTALLER LEAV...

Страница 121: ...14 Alcove Clearances 15 Mobile Home Installation 16 Vent Termination Requirements 17 Exhaust And Fresh Air Intake Locations 18 Outside Fresh Air Connection 18 Corner Through Wall Installation 19 Hori...

Страница 122: ...damper located on the left side of the stove When installing the stove in a mobile home it must be electrically grounded to the steel chassis of the home and bolted to the floor Make sure that the str...

Страница 123: ...KE DETECTOR Smoke detectors should be installed and maintained in the structure when installing and operating a pellet burning appliance OPERATION The ash pan and door must be closed securely for prop...

Страница 124: ...aximum Heat Content approximately 8200 Btu per pound minimum ASH The ash content of the fuel and operation of your stove will directly determine the frequency of cleaning The use of high ash fuels may...

Страница 125: ...tes ranging from 8 894 23 765 Btu hr Efficiency 69 7 HHV WARNING This pellet heater needs periodic inspection and repair for proper operation It is against federal regulations to operate this pellet h...

Страница 126: ...essed all the light will light up on the Heat Output Indicator except for the one that shows the current setting the default setting is the number 4 light To adjust the setting hold the Feed Rate Trim...

Страница 127: ...en the thermostat contacts open the HEAT LEVEL and Fans will drop down to the LOW setting until the thermostat contacts close again The LOW heat setting can be adjusted for different fuel qualities se...

Страница 128: ...run on low for three 3 minutes before it turns off DO NOT unplug unit while Combustion fan is operating This may lead to smoke escaping from the stove The vacuum pressure inside the firebox will incre...

Страница 129: ...ne Tuning For Fuel Quality Due to fuel quality the slider damper and control board trims may need to be fine tuned A tall lazy flame with dark orange tips requires more air Open slider pull out slight...

Страница 130: ...auger to jam and may result in pellets burning in the drop tube and hopper Using a metal scrapper remove material that has accumulated or is clogging the liner s holes Then dispose of the scrapped as...

Страница 131: ...ight assembly ASH PAN weekly The ash pan is located under the burner Dump the ashes into a metal container stored away from combustibles Monitor the ash level every week Remember that different pellet...

Страница 132: ...he firebox door by lifting the handle remove the burn pot and burn pot liner Lubricate all screws with penetrating oil Remove the four 4 screws that hold the steel liner retainers in place Remove side...

Страница 133: ...1 Check clearances to combustibles see Installation Clearances to Combustibles and Installation Alcove Clearances 2 Do not obtain combustion air from an attic garage or any unventilated space Combusti...

Страница 134: ...are minimum clearances but it is recommended that you ensure sufficient room for serving routine cleaning and maintenance Figure 16 Minimum Clearances to Combustibles for Meridian Cast Iron This pelle...

Страница 135: ...16 Minimum Width 36 914mm Minimum Height 48 1219mm Maximum Depth 30 762mm Figure 17 Alcove Clearances Freestanding Meridian Installation Alcove Clearances...

Страница 136: ...oor using the holes in the legs of the appliance Ensure the unit is electrically grounded to the chassis of your home permanently WARNING Do not install in a room people sleep in CAUTION The structura...

Страница 137: ...ation locations Table 1 Use in conjunction with Figure 13 for allowable exterior vent termination locations Letter Minimum Clearance Description A 24 in 61 cm Above grass top of plants wood or any oth...

Страница 138: ...Air Connection Figure 20 Meridian Cast Iron Inlet and Outlet Location INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENTING MANUFACTURER Outside fresh air is mandatory when installing this unit in airti...

Страница 139: ...bing wiring etc 2 Install a non combustible hearth pad where necessary 3 Place the appliance 15 37 5 cm away from the wall If the stove is to be set on a hearth pad set the unit on it 4 Locate the cen...

Страница 140: ...Straight through wall Installation 10 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the outside of the home to connect to the first...

Страница 141: ...th a rodent screen may be used in place of the termination cap or stainless steel termination hood Through Concrete Wall With Vertical Rise Installations A 45 elbow with a rodent screen may be used in...

Страница 142: ...n a carpeted surface and space the unit in a manner so when the pellet vent is installed vertically it will be 3 76 mm away from a combustible wall 3 Locate the center of the fresh air intake pipe on...

Страница 143: ...ean out on the outside of the house 2 Install PL vent upward from the tee Make sure that you install support brackets to keep the vent straight and secure 3 Install ceiling thimble and secure the flas...

Страница 144: ...t the fireplace dampers 3 Connect a clean out tee or a 90 elbow to the exhaust pipe 4 Install flexible stainless steel liner or listed pellet vent to the top of the chimney Floor Protection Combustibl...

Страница 145: ...er the gasketed opening in the stove where the exhaust motor was removed from 4 Install the exhaust blower motor in the Exterior Vent Housing Box onto the exhaust blower housing 5 Follow the procedure...

Страница 146: ...a small bead of high temperature silicone at each chimney connection Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in accord...

Страница 147: ...Outside Vertical Installations Ensure that vent pipe is properly secured to wall using wall straps Maintain clearances to combustibles on vent pipe as well as unit Rain Cap Roof sheathing Storm collar...

Страница 148: ...nit has been placed in the HI LOW mode the unit will be taken to a low or idle setting when the thermostat is not calling for heat When the thermostat calls for heat the unit will go to the setting th...

Страница 149: ...ced in the burn pot Check the Heat Level Indicator If the 2 light is flashing see the 2 light is flashing Check the fuse on the circuit board If the unit still does not start contact your local servic...

Страница 150: ...is installed Check the operation by opening a window does this solve the problem If it does install fresh air intake to unit or room Venting system may require vertical section to move termination int...

Страница 151: ...gnitor should be bright orange in color If not replace the ignitor 9 Control settings Heat Level has no effect on the fire NOTE If the system light is flashing the Control Board has complete control o...

Страница 152: ...Yellow Yellow Grey Grey Grey Grey Purple Purple Blue 115V Black 220V Brown Black Black Black Blue Black Armor Cable Supplied Vacuum Switch Combustion Blower Optional Exterior Exhaust Blower Power Cor...

Страница 153: ...icone Hose EF 018 Aluminum Hose Barb EF 019 7 Auger EF 025 8 Circuit Board 50 1929 Circuit Board Decal 50 1930 9 Brass Auger Bushing EF 065 10 Combustion Exhaust Blower 115V 50 901 11 Slider Damper Pl...

Страница 154: ...0 20 Back Grill 50 675 21 Hopper Lid 50 3108 22 Flush Handle for Hopper Lid 50 3109 23 Firebox Door Complete 50 3110 24 Firebox Door Glass Set w Tape EF 062 25 Firebox Door Latch handle 50 2827 26 Woo...

Страница 155: ...36 MERIDIAN CAST IRON Components May 2015 4 11 1 10 6 2 9 7 5 3 8 Parts Diagram Components...

Страница 156: ...37 24 27 23 26 25 14 12 16 15 29 28 20 30 32 19 31 33 13 17 18 18 21 22 33 MERIDIAN CAST IRON Components Cast Steel May 2015 Parts Diagram Cast Steel...

Страница 157: ...38 Notes...

Страница 158: ...als for which the unit is not certified by the EPA and void if not operated according to the Owner s Manual Exclusions An expanded list of exclusions is available at www enviro com help warranty html...

Страница 159: ...L NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy MAGNEHELIC AT INSTALL ___________________ INSTALLER S SIGNATURE _____________...

Отзывы: