. Lay the cover on the ground next to the 

frame with the inside of the cover (the side 

with the pipe pockets) facing down and the 

webbing on the front and rear of the corner 

of the building.  Position the cover so that it is 

centered to the frame, front to back. Fig. 11A

B.  

Fold over the side closest to the frame so 

the pipe pocket is now accessible. Insert a 

cover pipe at the first middle rib from the front 

and the first middle rib from the rear so that it 

is inserted in the pipe pocket on both ends of 

the pipe but the center of the pipe is exposed.  

For long buildings it may be necessary to use 

additional pipes in the middle. Fig. 11B.

C.  

Tie the rope on each of the exposed pipes 

and throw the other end of the rope over the 

frame. Fig. 11C.  

D. 

Move to the other side of the frame and 

pull the cover over the frame with the rope.  

This may require two or more people.

Fig. 11D.

11. INSTALLING THE COVER ON THE FRAME

END PANELS 

NOT SHOWN 

FOR CLARITY. 

NOTE: CHECK THAT YOUR COVER IS 

CORRECTLY PLACED ON THE FRAME.  

The ShelterLogic

®

 logo should line up on the left front and 

right rear corners near the top rail. If the logo is not legible, 

the cover has not been put on the frame correctly.

Fig.11A

Fig.11B

Fig.11C

Fig.11D

Содержание ShelterCoat Round

Страница 1: ...d for assembly Assembly time is dependent upon the length of your building Allow approximately 15 minutes for every foot in building length Please read instructions COMPLETELY before assembly This she...

Страница 2: ...ser responsable si el refugio se vuela o colapsa NOTA Si se pronostican vientos o condiciones clim ticas severas en su zona le recomendamos que retire la cubierta La cubierta del refugio puede retira...

Страница 3: ...ces l ments Tous les produits doivent tre retourn s dans leur emballage original si possible Cette garantie vous donne des droits juridiques sp ci ques et vous pouvez galement avoir d autres droits qu...

Страница 4: ...urerqu elle soitrectangulaire Danslapluspartdessituations desancragesadditionnelssontrecommand s ShelterLogicvoussugg reunancrageparpieds Los refugios los toldos y los garajes de ShelterLogic vienen c...

Страница 5: ...Assembly Reference Mfg Part 1 11114 11 11106 2 11113 12 11179 3 11182 13 800057 4 11112 14 11131 5 11051 15 11130 6 11102 16 11133 7 11104 17 00648 8 11005 18 800454 9 11105 19 800372 10 11107 ATTENTI...

Страница 6: ...ual to the width of the shelter and the length should be equal to the length of the shelter Fig 1 B Measure diagonally from corner to corner A B These measurements should be the same If they are not e...

Страница 7: ...B Place the ShelterLock 800372 on the upright as shown in Fig 5 C From the outside of the rib insert the bolt through the upright and then through the ShelterLock D Place the plain end of a Cross Rai...

Страница 8: ...lat and level as possible B Measure across opposite corners These distances must be equal to within 1 inch C Check that the front and rear of the frame measures 15 feet in width 15 ft Fig 8 9 INSTALL...

Страница 9: ...ide of end panel pull webbing to remove the slack Be careful not to pull the webbing through the other side of the webbing pocket D Insert the S Hook on ratchet into hole on the leg bend Insert the we...

Страница 10: ...et on both ends of the pipe but the center of the pipe is exposed For long buildings it may be necessary to use additional pipes in the middle Fig 11B C Tie the rope on each of the exposed pipes and t...

Страница 11: ...he webbing into the spindle of the ratchet and pull tight Wind the ratchet so that the webbing overlaps itself C Slide cover rails 11105 through fabric pockets at each leg and reattach with clamps to...

Страница 12: ...on 3 heures Le temps de montage d pend de la longueur de votre b timent Veuillez pr voir environ 15 minutes pour chaque pied de longueur du b timent Veuillez lire TOUTES les instructions avant d entre...

Страница 13: ...MANQUANTE ET POUR TOUTE PI CE DE RECHANGE OU TOUTE QUESTION VEUILLEZ COMMUNIQUER AVEC LE SERVICE LA CLIENT LE 1 800 524 9970 CANADA 1 800 559 6175 Nervures centrales Tube sup rieur Rail lat raux Rails...

Страница 14: ...argeur de l emplacement doit tre au moins gale la largeur de l abri et sa longueur celle de l abri fig 1 B Mesurez la distance en diagonale entre les coins A et B Cette distance doit tre gale dans tou...

Страница 15: ...et B Placez la pi ce ShelterLock 800372 sur le montant comme le montre la Fig 5 C partir de l ext rieur de la nervure ins rez le boulon dans le montant puis dans la pi ce ShelterLock D Alignez l extr...

Страница 16: ...doit tre aussi plane que possible B Mesurez la distance qui s pare les coins oppos s X et Y Cette distance doit tre la m me 1 pouce pr s C Assurez vous que les sections avant et arri re de l armature...

Страница 17: ...neau tirez sur la sangle pour tendre le panneau Faite bien attention de ne pas trop tirez sur la sangle pour vitez qu elle disparaisse de l autre cot du panneau D Ins rez le crochet en S dans le trou...

Страница 18: ...t et l arri re de l armature fig 11A B Repliez le c t le plus proche de l armature de sorte que le fourreau pour tuyau soit accessible Ins rez un tuyau de toile la premi re nervure centrale partir de...

Страница 19: ...ixez les avec une bride chaque pied R p tez cette tape de l autre c t Appuyez sur les rails de toile pour tendre la toile avant de serrer compl tement les boulons D V rifiez les cliquets et les rails...

Отзывы: