OPERATION
P
UT THE
O
VEN INTO
O
PERATION
Perform the procedures below after the unit has been installed in a new workplace location. These
verify the integrity of the vacuum system and prepare the oven for normal use.
Continued next page
1.
2.
Attach the Power Cord
Attach the power cord that came with the unit to the power inlet
receptacle on the back of the oven.
Plug the power cord into the workspace electrical supply.
3.
Verify the Door and Valves are Closed
Verify the oven
chamber door
is
closed and latched
, and
that the
vent intake valve and vacuum valve
are in
the
closed position
(turned all the way clockwise).
This safeguards your vacuum pump from exposure to
streaming atmosphere.
4.
Turn on the Oven
Place the oven
Power Switch
in the ON ( I ) position.
•
The controller display will illuminate and default to its
homepage.
•
The vacuum display will illuminate.
5.
Set the High Limit Temperature
Use the
Set the High Temperature Limit
procedure on
33T
page 42 to set
33T
to the Limit heating cutoff at least 10°C above
the highest intended temperature of your application
33T
.
6.
Plug in the Vacuum Pump
Plug the vacuum pump power cord into a wall power source.
Содержание SHEL LAB SVAC1
Страница 1: ...Installation Operation Manual SVAC1 SVAC2 SVAC4 VACUUM OVENS 110 120 Volts...
Страница 6: ...6 P a g e TABLE OF CONTENTS...
Страница 12: ...12 P a g e INTRODUCTION...
Страница 24: ...24 P a g e RECEIVING...
Страница 34: ...34 P a g e SYMBOLS...
Страница 74: ...74 P a g e UNIT SPECIFICATIONS...
Страница 77: ...77 P a g e PARTS LIST...