
31
|
P a g e
INSTALLATION
Shelving Installation Continued
SVAC4 Shelving
To ensure accurate temperature measurement,
one shelf bottom must be in close proximity to the
oven temperature probe.
This probe extends out from the chamber back wall. Do not place the
shelf in direct contact with the probe.
1. Install the shelf clips in the slots of the shelf standard mounting rails located on the sides of the
chamber interior, 4 clips per shelf.
a. Squeeze each clip, insert the top tab first, and then the bottom tab using a
rocking motion.
2. Set the shelves on the clips.
a. Verify the shelves are level.
Rocking Motion
Probe
Shelf
Install 4 Shelf Clips
Place the Shelf
Содержание SHEL LAB SVAC1
Страница 1: ...Installation Operation Manual SVAC1 SVAC2 SVAC4 VACUUM OVENS 110 120 Volts...
Страница 6: ...6 P a g e TABLE OF CONTENTS...
Страница 12: ...12 P a g e INTRODUCTION...
Страница 24: ...24 P a g e RECEIVING...
Страница 34: ...34 P a g e SYMBOLS...
Страница 74: ...74 P a g e UNIT SPECIFICATIONS...
Страница 77: ...77 P a g e PARTS LIST...