8
SharpEye
TM
40/40 Air Shield Installation Guide
2
Air Shield Installation Instructions
2.1
Surface Preparation
1
Verify that all connection surfaces (1) are clean.
2
Verify that the lock screw (2) is open.
The screw is a captive screw.
Figure 1: Surface Preparation
www.acornfiresecurity.com
www.acornfiresecurity.com