4
‐
29
USING
TOP
CLAMP
FOR
BUNDLE
CUTTING
Installing
top
clamp
To
perform
bundle
cutting,
use
the
top
clamps
and
take
the
following
installation
procedures.
Step
1
–
Install
stud
bolts
on
the
front
and
rear
vises
and
position
the
top
clamp.
Step
2
–
Connect
the
top
clamp
hoses
to
the
pressure
joints
on
the
vise
hydraulic
cylinders.
Step
3
–
Position
the
workpiece
for
bundle
cutting.
Note
the
allowable
clamping
width
and
height.
(Refer
to
Section
2
–
General
Information,
Specifications
)
Proper
and
improper
stacking
of
workpieces
Proper
Improper
Step
4
–
Align
the
top
clamp
cylinders
with
the
center
of
the
workpiece
and
tighten
the
lock
nuts.
Step
5
–
Turn
the
top
clamp
handles
so
that
the
clearance
between
the
top
clamp
jaw
and
the
top
of
the
bundled
workpiece
is
within
5
to
10
mm
(
0.2
~
0.4
inch).
Step
6
–
Install
the
bundle
‐
cutting
fence
to
the
work
tray.
The
fence
is
designed
to
prevent
cut
pieces
Содержание SW-120NC
Страница 1: ...SW 120NC Instruction Manual Version 3 20180105 ...
Страница 2: ......
Страница 8: ......
Страница 13: ...1 5 Illustration Emergency Stop Emergency Stop Button ...
Страница 17: ...1 9 Illustration Safety Labels SW 120NC ...
Страница 23: ...2 5 FLOOR PLAN Machine top view Machine front view ...
Страница 24: ...2 6 Machine side view ...
Страница 66: ...5 2 Fig 5 1 Control panel layout ...
Страница 67: ...5 3 Fig 5 2 Circuit board layout ...
Страница 68: ...5 4 Fig 5 3 Power supply layout ...
Страница 69: ...5 5 Fig 5 4 PLC input output layout ...
Страница 70: ......
Страница 71: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC DIAGRAMS ...
Страница 72: ...6 2 ...
Страница 76: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......