4
‐
26
TEST
‐
RUNNING
THE
MACHINE
Test
‐
running
this
machine
can
ensure
good
machine
performance
in
the
future.
We
suggest
you
run
the
following
tests
on
the
machine
before
first
use:
Testing
machine
performance:
Turn
on
the
power
and
run
a
basic
performance
test
after
you
finish
installing
the
machine.
Follow
these
steps
to
test
machine
performance:
Step
1
–
Disassemble
shipping
brackets
and
bolts.
Step
2
–
Install
roller
table
(optional).
Step
3
–
Turn
on
the
relay
switch
in
the
control
box.
Step
4
–
Elevate
the
saw
bow.
(If
your
coolant
pump
is
in
reverse
and
the
machine
cannot
run,
please
change
the
electrical
phase.)
Step
5
–
After
the
saw
bow
ascends,
extend
the
quick
approach
device.
Step
6
–
Remove
the
rust
‐
prevention
grease
with
cleaning
oil
or
kerosene.
Step
7
–
Start
the
coolant
pump.
Step
8
–
Test
these
functions
under
manual
mode:
vise
clamping/unclamping
saw
bow
ascending/descending
feeding
forward
and
backward
Содержание SW-120NC
Страница 1: ...SW 120NC Instruction Manual Version 3 20180105 ...
Страница 2: ......
Страница 8: ......
Страница 13: ...1 5 Illustration Emergency Stop Emergency Stop Button ...
Страница 17: ...1 9 Illustration Safety Labels SW 120NC ...
Страница 23: ...2 5 FLOOR PLAN Machine top view Machine front view ...
Страница 24: ...2 6 Machine side view ...
Страница 66: ...5 2 Fig 5 1 Control panel layout ...
Страница 67: ...5 3 Fig 5 2 Circuit board layout ...
Страница 68: ...5 4 Fig 5 3 Power supply layout ...
Страница 69: ...5 5 Fig 5 4 PLC input output layout ...
Страница 70: ......
Страница 71: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC DIAGRAMS ...
Страница 72: ...6 2 ...
Страница 76: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......