background image

6

2

8

6

0

7

15

75

15

15

(

)

10

(

)

6

.

9

1

58

125

60
15

350

0

1

(

)

6

.

9

1

(

)

10

90

0

50

18

7.5

30

0

30

0

30

0

30

0

10

0

2

9

7

6

5

7

H

O

LE

 F

O

R

 G

R

O

U

N

D

 2

-
3.3

R 5.

4

D

C

C

C

D

3

R

-

4

5

.

2

R

-

4

C

C

C

D

D

(+

)

(-)

G

R

O

U

N

D

 S

Y

M

B

O

L

G

R

O

U

N

D

 S

Y

M

B

O

L

PVU-B50

IP65

1000V

PVU-B50

C E

FFiigguurree 11

BOLT M8 x 20mm

WASHER
SPRING WASHER

NUT

SOLAR MODULE

1.

2.

3.

4.

WASHER

(BOLT 5'16" x 3/4")

FFiigguurree 22

BOLT M8 x 20mm

WASHER
SPRING WASHER

NUT

SOLAR MODULE

1.

2.

3.

4.

WASHER

(BOLT 5'16" x 3/4")

INSTALLATION MANUAL FOR PHOTOVOLTAIC MODULES

NT-170E1

NT-175E1

INSTALLATION

The mounting method has been verified by SHARP and NOT CERTIFIED by a third party organization. Please review the descriptions and drawings

carefully; not mounting the modules according to one of these methods may void your warranty. These mounting methods are designed to allow

module loading of 2400Pa.

Mounting Using Frame Bolt Holes (Figures 1 & 2)

The modules may be fastened to a support using the bolt holes in the bottom of the frame at location “C”, as shown in Figure 1 (back view of the

module) and Figure 2 (mounting detail). The module should be fastened with six (6) M8 (5/16”) bolts. Take care during installation to not block the

drain holes (D) shown in Figure1.

Mounting Using Clips on Long Edge of Module: Long Edge Parallel to Array Rails (Figure 4)

The modules may be mounted using clips (clamps) designed for solar modules as shown in Figures 3 and 4. Note that the clip positions are impor-

tant – the clip centerlines must be between 6.4” (162mm) and 15.5” (393mm) from the end of the module. The module must be supported along

the length of the long edge, and should overlap the array rail by at least 0.4” (10mm). Note that the mounting clips should meet the minimum di-

mensions (catch width of 0.2” (5mm) and length of 1.2” (30mm)) as shown in Figure 3. The array rails must support the bottom of the modules and

must be continuous pieces (no breaks in the rail). Take care during installation to not block the drain holes (D) shown in Figure 1.

Mounting Using Clips on Long Edge of Module: Long Edge Perpendicular to Array Rails (Figure 5)

The modules may also be mounted using clips on the long sides of the module when the array rails are perpendicular to the long sides, as shown in

Figure 5. The clip centerlines must be between 6.4” (162mm) and 15.5” (393mm) from the ends of the module. Note that the mounting clips should

meet the minimum dimensions (catch width of 0.2” (5mm) and length of 1.2” (30mm)) shown in Figure 3. The array rails must support the bottom of

the modules and must be continuous pieces (no breaks in the rail). Take care during installation to not block the drain holes (D) shown in Figure 1.

Clip

Frame

Rail

10mm Min.

Support width

5mm Min.

Catch width

30mm Min.

Catch length

6.4" (162mm) < 

g

 < 15.5" (393mm)

g

g

g

g

6.4" (162mm) < 

u

 < 15.5" (393mm)

u

u

u

u

FFiigguurree 33

FFiigguurree 44

FFiigguurree 55

For your reference, please use

the washer specified as below

for the minimum requirement:

1) Spring washer

Material Stainless SUS304A

Diameter M8 8.2/15.4 mm  

(JIS B 1251)

Thickness 2 mm  (reference

value)

2) Washer

Material Stainless SUS304A

Diameter M8 8.5/15.5 mm  

(JIS B 1256)

Thickness 1.6 mm  (refer-

ence value)

ELECTRICAL INSTALLATION INSTRUCTION

Note: Parallel configuration is not limited in case of taking proper measure (e.g. fuse for protection

of module and cable from over current, and/or blocking diode for prevention of unbalanced strings

voltage) to block the reverse current flow.

Size: 4.0mm

2

Cable characteristics

Type: CE cable
Temperature rating of conductor: -40 - 110

o

C

Module configuration

Maximum series configuration: 17 in series

(Recommend)

This value is calculated under the condition of Voc at -40

o

C.

* This module maximum system

Maximum parallel strings w/o proper measures (e.g. fuse 

voltage is 1000V

and/or blocking diode): 1 string

Содержание ND-158E1F

Страница 1: ...6 In the case that the PV modules are non integral type the module is to be mounted over a fire resistant roof 7 Please use PV modules with same cell size within series 8 Follow all safety precautions of other components used in the system 9 In order to avoid a risk of injury or electrical shock do not allow anyone to approach the PV module if the person has little knowledge on PV module or on the ...

Страница 2: ...r warranty observe the correct cable connection polarity Figures 1 2 when connecting the modules to a battery or to other modules If not connected correctly the bypass diode could be destroyed PV modules can be wired in series to increase voltage Connect wires from the positive terminal of one module to the negative terminal of the next module Figure 1 shows modules connected in series Connect PV ...

Страница 3: ...ray rails must support the bottom of the modules and must be continuous pieces no breaks in the rail Take care during installation to not block the drain holes D shown in Figure 1 Mounting Using Clips on Long Edge of Module Long Edge Perpendicular to Array Rails Figure 5 The modules may also be mounted using clips on the long sides of the module when the array rails are perpendicular to the long s...

Страница 4: ... shown in Figure 3 The array rails must support the bottom of the modules and must be continuous pieces no breaks in the rail Take care during installa tion to not block the drain holes D shown in Figure 1 Mounting Using Clips on Long Edge of Module Long Edge Perpendicular to Array Rails Figure 5 The modules may also be mounted using clips on the long sides of the module when the array rails are p...

Страница 5: ...s must support the bottom of the modules and must be continuous pieces no breaks in the rail Take care during installation to not block the drain holes D shown in Figure 1 Mounting Using Clips on Long Edge of Module Long Edge Perpendicular to Array Rails Figure 5 The modules may also be mounted using clips on the long sides of the module when the array rails are perpendicular to the long sides as ...

Страница 6: ...ard 11 Consult your local building and safety department for required permits and applicable regulations C CA AU UT TI IO ON N H HI IG GH H V VO OL LT TA AG GE E T To o r re ed du uc ce e t th he e r riis sk k o of f e elle ec ct tr riic c s sh ho oc ck k d do o n no ot t t to ou uc ch h Under normal conditions a photovoltaic module is likely to experience conditions that produce more current and ...

Страница 7: ...aak geen oppervlakken van de module aan 5 Plaats geen voorwerpen of laat geen voorwerpen vallen op de FV modules 6 Probeer de FV module niet zelf te demonteren of te repareren 7 Laat de FV module niet vallen 8 Let op dat u de kabels niet beschadigt eraan trekt buigt of er zware voorwerpen op plaatst 9 Vraag na het voltooien van onderhoud of reparaties aan de installateur onderhoudstechnicus om rou...

Страница 8: ...udota esineitä paneelien päälle 6 Älä pura tai yritä korjata paneelia itse 7 Älä pudota paneelia 8 Älä vahingoita vedä tai taivuta johtoja tai pane niiden päälle painavia esineitä 9 Kun laitetta on huollettu tai korjattu pyydä asentajaa huoltohenkilöä suorittamaan rutiinitarkastukset joiden avulla voidaan määrittää ovatko aurinkosähköpaneelit turvallisessa ja toimivassa käyttökunnossa 10 Jos tarvi...

Страница 9: ...LLASJONSHÅNDBOKEN og INSTALLASJON SHÅNDBOK FOTOELEKTRISK MODUL Hvis du ikke har noen egen kopi ta kontakt med installatøren eller din lokale Sharp forhan dler som du finner på Sharp Solar nettsted med adresse http www sharp world com solar 3 Ikke trekk i PV kablene 4 Ikke berør noen av overflatene på modulen 5 Ikke plasser mist noen gjenstander på PV modulene 6 Ikke demonter eller forsøk å reparere ...

Страница 10: ... solar 3 Ná tarraing na cáblaí fótavoltacha 4 Ná leag lámh ar aon chuid de dhromchla an mhodúil 5 Ná cuir ná lig do rudaí titim ar na modúil fótavoltacha 6 Ná díchóimeál nó ná déan iarracht an modúl fótavoltach a dheisiú tú féin 7 Ná lig don mhodúl fótavoltach titim 8 Ná scrios ná tarraing ná lúb nó ná leag ábhar trom ar na cáblaí 9 Agus seirbhís éigin nó deisiúcháin déanta iarr ar an innealtóir s...

Страница 11: ...dere oggetti sul modulo fotovoltaico 6 Non smontare né tentare di riparare il modulo fotovoltaico senza l assistenza di un tecnico qualificato 7 Non lasciar cadere il modulo fotovoltaico 8 Non danneggiare tirare piegare né posizionare materiali pesanti sui cavi 9 Al termine delle operazioni di manutenzione o riparazione chiedere all addetto all installazione manutenzione di eseguire i controlli di ...

Страница 12: ...z 5 PV modüllerine hiçbir nesne yerleştirmeyiniz düşürmeyiniz 6 PV modülünü parçalarına ayırmayınız veya kendiniz onarmaya çalışmayınız 7 PV modülünü düşürmeyiniz 8 Kablolara zarar vermeyiniz bunları çekmeyiniz bükmeyiniz veya üzerlerine ağır malzemeler yerleştirmeyiniz 9 Herhangi bir bakım veya onarım tamamlandıktan sonra PV modüllerinin güvenli olup olmadığını ve doğru bir şekilde çalışıp çalışm...

Отзывы: